Skip to content
Department of Transportation

Sign Manufacturing, Fabricating, Installation Materials, Supplies & Accessories

Solicitation: BD-24-1030-0H100-0H011-92886
Notice ID: ma_commbuys_8a76625f33a919e85d18
DepartmentDepartment of TransportationStateMAPostedDueJul 31, 2029, 03:00 PM UTCCloses in 1162 daysBid range$432,739 - $512,876
Contract snapshot

Federal opportunity from Department of Transportation. Place of performance: MA. Response deadline: Jul 31, 2029.

Source
Open on official portal →
Solicitation
BD-24-1030-0H100-0H011-92886
Performance
MA
Response
Jul 31, 2029, 03:00 PM UTC
Open on official portal →
Live POP
Place of performance
MA
Contracting office
Not listed

Point of Contact

Name
Nicauris Santana
Email
Not available
Phone
Not available

Agency & Office

Department
Department of Transportation
Agency
Not available
Subagency
Not available
Office
Nicauris Santana
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260018 (Rev 1)
Published May 18, 2026Massachusetts • Essex
24 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 22 more rate previews.
Davis-BaconBest fitstate match
MA20260018 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Essex
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Plymouth
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; POST DRIVER (GUARDRAIL/FENCES)
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD

Description

This is a rolling enrollment bid. Quotes will be evaluated as they are received.

Advisory bid range

Pricing and bid posture

medium confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 19, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

This opportunity is for the manufacturing, fabricating, and installation of signs and related materials under notice ID ma_commbuys_8a76625f33a919e85d18. The solicitation involves rolling enrollment, meaning quotes will be evaluated as they are received, providing a flexible bidding cycle. The opportunity is issued through the HIGHWAY agency and has a response deadline of July 31, 2026.

Sign manufacturingInstallation suppliesRolling enrollmentHighway projectsNAICS codes
What the buyer is trying to do

The buyer is looking to procure materials, supplies, and accessories necessary for sign manufacturing and installation to support ongoing transportation projects.

Who should pursue this
  • Companies experienced in sign manufacturing
  • Suppliers with expertise in installation materials
  • Contractors in the transportation sector
Work breakdown
  • Manufacturing and fabricating signs
  • Supplying installation materials and accessories
  • Providing technical documentation and support
Response package checklist
  • Detailed quotes for sign manufacturing
  • Evidence of past performance
  • Compliance with relevant safety standards
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • All submissions must adhere to NAICS codes listed
  • Quotes must be submitted in compliance with Commonwealth regulations
Pricing strategy
  • Consider competitive pricing due to ongoing roll-in evaluations
  • Include volume discounts for large orders
Teaming and subs
  • Partner with local installers to enhance service delivery
  • Consider teaming with material suppliers for comprehensive bids
Risks and watchouts
  • Competitive bidding environment may drive down margins
  • Potential delays in evaluation if not properly submitted
Smart questions to ask
  • What specific types of signs are prioritized for procurement?
  • Are there specific material standards that must be met?
  • How often will evaluations occur during the rolling enrollment?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No explicit scope of work provided
  • No estimated budget or pricing guidelines
  • Lack of information on previous contracts or incumbent contractors
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-24-1030-0H100-0H011-92886
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.