613404 NORTHAMPTON HVAC Repairs to District Administration Building at 811 North King Street
Federal opportunity from Department of Transportation. Place of performance: MA. Response deadline: Jun 16, 2026.
- Source
- Open on official portal →
- Solicitation
- BD-26-1030-0H100-0H002-125981
- Performance
- MA
- Response
- Jun 16, 2026, 02:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 5 more rate previews.↓
Description
Do Not Use COMMBUYS to Bid on this Project
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The opportunity involves HVAC repairs to the District Administration Building located at 811 North King Street, as indicated in notice ID ma_commbuys_a33c32b65427da970aef. The project is set as SBPP Eligible, allowing small business participation. The response deadline is May 5, 2026, which provides ample time for bidders to prepare their proposals.
The buyer seeks to procure services for HVAC repairs, ensuring the District Administration Building is properly maintained and operational.
- HVAC contractors with experience in commercial repairs
- Small businesses eligible under SBPP
- Assess current HVAC systems
- Identify necessary repairs
- Procure materials and equipment
- Execute repairs and maintenance
- Conduct post-repair evaluation
- Bid proposal including pricing
- Company qualifications and past performance references
- Safety and quality assurance plan
- Proof of SBPP eligibility
- Technical approach to the repairs
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure compliance with local and state regulations for HVAC work
- Obtain necessary permits before commencing repairs
- Consider cost of materials and labor
- Include contingency for unforeseen repairs
- Partner with local HVAC supply companies for materials
- Collaborate with subcontractors for specialized repair services
- Potential delays in material procurement
- Challenges in scheduling repairs without disrupting building operations
- What is the current condition of the HVAC systems?
- Are there specific compliance standards that must be met?
- What is the expected timeline for repairs once the contract is awarded?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed specifications of HVAC repairs required
- Budget or funding limits for the project
- Specific warranty requirements for repairs
- Current condition assessments of HVAC systems
- Timeline for completion of repairs before and after start date
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.