608020 BOURNE Bridge Replacement, B-17-005, (ARF) (SAGAMORE BRIDGE), US 6 over the Cape Cod Canal,
Federal opportunity from Department of Transportation. Place of performance: MA. Response deadline: May 27, 2026.
- Source
- Open on official portal →
- Solicitation
- BD-26-1030-0H100-0H002-126991
- Performance
- MA
- Response
- May 27, 2026, 12:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 22 more rate previews.↓
Description
608020 BOURNE Bridge Replacement, B-17-005, (ARF) (SAGAMORE BRIDGE), US 6 over the Cape Cod Canal,
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Massachusetts Department of Transportation (MassDOT) is seeking Letters of Interest for the Design-Build Project of the Bourne Bridge Replacement, known as B-17-005. This project involves US 6 over the Cape Cod Canal and is set to accept qualifications until May 27, 2026. As part of a Small Business Participation Program (SBPP), this opportunity is well-suited for eligible small businesses looking to engage in significant infrastructure work.
MassDOT aims to gather interest and qualifications from firms for the design and construction of the Bourne Bridge Replacement project, which will ultimately enhance transportation over the Cape Cod Canal.
- Small businesses in construction and engineering sectors
- Firms with experience in bridge design and replacement
- Companies familiar with Massachusetts transportation standards
- Preliminary design assessment
- Final design development
- Construction and project management
- Post-construction evaluation
- Letter of Interest
- Documentation of relevant experience
- Identification of project team members
- Financial capability statement
- Proof of SBPP eligibility
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure compliance with Massachusetts state regulations
- Adhere to SBPP guidelines for participation
- Follow environmental and zoning regulations specific to the project area
- Assess competitive pricing for design-build procurement
- Consider value engineering to enhance cost-efficiency
- Provide competitive rates that reflect small business capabilities
- Potential alliances with engineering firms with bridge experience
- Coordination with local subcontractors for labor and materials
- Involvement of environmental consultants familiar with the Cape Cod area
- Tight project deadlines may affect quality
- Potential challenges in securing local permits
- Fluctuating material costs impacting pricing
- What are the specific qualifications that MassDOT is prioritizing in submissions?
- Are there any pre-existing environmental assessments available for review?
- What is the anticipated timeline for post-selection project phases?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Final RFQ package details not provided
- Information regarding funding sources is unclear
- No specific performance timeline indicated for deliverables
- Details on local permitting requirements are missing
- Information on community engagement requirements not specified
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.