Skip to content
Department of Transportation

610647 WAREHAM FAP No. STP-0035(068)X Corridor Improvements on Route 6 at Swifts Beach Road

Solicitation: BD-26-1030-0H100-0H002-127287
Notice ID: ma_commbuys_e10dde73a3a673b01f56
Source codes72, 14, 10Set-AsideSBPP Eligible: YESDepartmentDepartment of TransportationAgency0h100 - HighwayStateMAPostedMar 30, 2026, 10:22 AM UTCDueMay 05, 2026, 02:00 PM UTCExpiredBid range$316,256 - $374,822
Contract snapshot

Federal opportunity from 0H100 - HIGHWAY • Department of Transportation. Place of performance: MA. Response deadline: May 05, 2026. Industry: Source industry codes 72, 14, 10.

Source
Open on official portal →
Solicitation
BD-26-1030-0H100-0H002-127287
Performance
Park Plaza Boston, MA 02116
Response
May 05, 2026, 02:00 PM UTC
Open on official portal →
Map for MA
Live POP
Place of performance
Park Plaza Boston, MA 02116
State: MA
Contracting office
Construction Unit 10 Park Plaza Boston, MA 02116 US

Point of Contact

Name
eric.m.cardone
Email
eric.m.cardone@dot.state.ma.us
Phone
Not available

Agency & Office

Department
Department of Transportation
Agency
0H100 - HIGHWAY
Subagency
0H100 - HIGHWAY
Office
0H002 - Construction Statewide Contracts
Contracting Office Address
Construction Unit 10 Park Plaza Boston, MA 02116 US

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260018 (Rev 1)
Published May 18, 2026Massachusetts • Essex
24 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 22 more rate previews.
Davis-BaconBest fitstate match
MA20260018 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Essex
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Plymouth
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; POST DRIVER (GUARDRAIL/FENCES)
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD

Description

Do Not Use COMMBUYS to Bid on this Project

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 31, 2026
Client-ready brief
Executive summary
high confidencegpt 4o mini

The opportunity involves corridor improvements on Route 6 at Swifts Beach Road as part of project STP-0035(068)X under the jurisdiction of the Highway agency. This project has a response deadline of May 5, 2026, and is set aside for Small Business Participation Program (SBPP) eligible firms. Interested bidders should note that submissions via COMMBUYS are not permitted.

Route 6 improvementsSBPP eligibilityhighway constructioncorridor enhancementsource codes 72, 14, 10
What the buyer is trying to do

The buyer is seeking qualified contractors to undertake significant improvements to a specific highway corridor, enhancing safety and traffic flow at the intersection of Route 6 and Swifts Beach Road.

Who should pursue this
  • Small businesses in highway construction
  • Firms with experience in corridor improvements
  • Contractors familiar with state and federal highway projects
Work breakdown
  • Project planning and design
  • Site preparation and excavation
  • Construction of road improvements and safety features
  • Installation of traffic management systems
Response package checklist
  • Technical proposal outlining the approach and expertise
  • Cost estimate and pricing strategy
  • Evidence of SBPP eligibility
  • Previous project references and experience summaries
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Must comply with all local and state regulations regarding highway construction
  • SBPP eligibility documentation must be included
Pricing strategy
  • Consider competitive pricing aligned with past similar projects
  • Provide a detailed breakdown of costs involved in each phase of the project
Teaming and subs
  • Consider partnering with local engineering firms for design aspects
  • Subcontracting opportunities for specialized tasks such as traffic management
Risks and watchouts
  • Potential delays due to environmental assessments
  • Risk of underestimating project scope based on initial bids
  • Compliance with local regulations may affect project timeline
Smart questions to ask
  • What are the specific qualifications required for SBPP eligibility?
  • Are there existing subcontracts or partnerships that can aid in this project?
  • What specific challenges have previously arisen at this intersection?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No details on specific improvement measures required
  • Lack of information on project budget or funding details
  • Unclear stakeholder engagement processes
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-26-1030-0H100-0H002-127287
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.