Skip to content
Department of Transportation

Rail: HYANNIS STATION PLATFORM IMPROVEMENTS

Solicitation: BD-26-1030-0T100-0T100-126687
Notice ID: ma_commbuys_e2c25f02dc9fbbdd9b0e
Source codes95, 12, 16, 72, 14, 00, 15Set-AsideSBPP Eligible: YESDepartmentDepartment of TransportationAgency0t100 - Rail And TransitStateMAPostedMar 18, 2026, 10:50 AM UTCDueApr 14, 2026, 02:00 PM UTCExpiredBid range$432,739 - $512,876
Contract snapshot

Federal opportunity from 0T100 - RAIL AND TRANSIT • Department of Transportation. Place of performance: MA. Response deadline: Apr 14, 2026. Industry: Source industry codes 95, 12, 16, 72, 14, 00, 15.

Source
Open on official portal →
Solicitation
BD-26-1030-0T100-0T100-126687
Performance
Park Plaza Boston, MA 02116
Response
Apr 14, 2026, 02:00 PM UTC
Open on official portal →
Map for MA
Live POP
Place of performance
Park Plaza Boston, MA 02116
State: MA
Contracting office
Chief Financial Office Unit 10 Park Plaza Boston, MA 02116 US

Point of Contact

Name
kevin.mcgrath
Email
kevin.mcgrath@dot.state.ma.us
Phone
Not available

Agency & Office

Department
Department of Transportation
Agency
0T100 - RAIL AND TRANSIT
Subagency
0T100 - RAIL AND TRANSIT
Office
0T281 - RAIL Departmental Contracts
Contracting Office Address
Chief Financial Office Unit 10 Park Plaza Boston, MA 02116 US

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260006 (Rev 2)
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
7 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 5 more rate previews.
Davis-BaconBest fitstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD
Davis-Baconstate match
MA20260025 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Worcester
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260016 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Berkshire
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $39.12Fringe $31.04
+20 more occupation rates in this WD
Davis-Baconstate match
MA20260001 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Bristol, Dukes +5
Rate
TOR/ASBESTOS WORKER (ZONE B) ZONE B- BARNSTABLE COUNTY (BARNSTABLE, BOURNE, FALMOUTH, MASHPEE, SANDWICH), BRISTOL COUNTY (ALL CITIES EXCEPT EASTON),AND NORFOLK COUNTY (BELLINGHAM, FRANKLIN, PLAINVILLE)
Base $55.45Fringe $36.63
Rate
OOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBOROUGH, HOLBROOK, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHAM, NORFOLK, NORWOOD, QUINCY, RANDOLPH, SHARON, STOUGHTON, WALPOLE, WELLESLEY, WESTWOOD, WEYMOUTH)
Base $55.45Fringe $36.63
Rate
URO, WELLFLEET AND YARMOUTH); BRISTOL (EASTON); ESSEX; MIDDLESEX; NORFOLK (AVON, BRAINTREE, BROOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBORO, HOLBROOK, HULL, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHA
Base $55.45Fringe $36.63
+87 more occupation rates in this WD

Description

Pre-Construction Survey and As-Built Plans Removal/Demolition of existing wood decking, canopy, canopy columns, and modular tactile surfaces Removal of threshold at doors to be stored for reuse, partial removal of guardrail at ramps to be store,,, see bid document

Advisory bid range

Pricing and bid posture

medium confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,474,911
Sector total $3,515,474,911 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,474,911)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 21, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Hyannis Station Platform Improvements project, solicited by the RAIL AND TRANSIT agency, focuses on significant renovations including the removal and demolition of existing wood decking and canopies. Proposals are due by April 14, 2026. This project is eligible for small business participation under the SBPP, emphasizing opportunities for narrower competitive fields.

rail station improvementdemolitionconstruction surveysmall business set-asideHyannis stationsource codes 95, 12, 16, 72, 14, 00
What the buyer is trying to do

The buyer intends to enhance rail station infrastructure by performing a pre-construction survey and developing as-built plans alongside multiple removal and demolition tasks according to the specifications laid out in the bidding documents.

Who should pursue this
  • Small businesses with experience in demolition and construction in transportation projects
  • Companies familiar with railway station improvements
  • Firms capable of detailed surveying and structural planning
Work breakdown
  • Pre-Construction Survey
  • As-Built Plans Development
  • Demolition of wood decking
  • Removal of canopy and canopy columns
  • Partial removal of guardrail at ramps
  • Storage of reusable materials including door thresholds
Response package checklist
  • Completed proposal form
  • Pre-construction survey proposals
  • Detailed approach to demolition
  • Qualifications and experiences relevant to rail construction
  • Proof of eligibility for SBPP
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure bidding complies with SBPP guidelines
  • Adhere to all local and federal construction safety regulations
Pricing strategy
  • Consider a competitive pricing model given the small business set-aside
  • Factor in costs for demolition and material reuse logistics
Teaming and subs
  • Consider teaming with local demolition experts
  • Potential partnership with certified surveying firms
Risks and watchouts
  • Potential delays in receiving permits for demolition
  • The structural integrity of existing platforms during removal
  • Weather-related impacts on the schedule
Smart questions to ask
  • What is the anticipated timeline for permit approvals?
  • Are there specific materials that must be reused?
  • What are the consequences for missed deadlines?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specifics on the total project budget
  • Details on existing condition of structures
  • Exact requirements for the pre-construction survey
  • Biographical data on previous projects of this nature
  • Clarification on award criteria for pricing versus experience
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-26-1030-0T100-0T100-126687
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.