Skip to content
Department of Transportation

MassDOT Due Diligence Posting Road Tape

Solicitation: BD-26-1030-CPO1-CPO1-125835
Notice ID: ma_commbuys_e7c4f250184a805b3b9c
Contract snapshot

Federal opportunity from CPO1 - OFFICE OF THE CHIEF PROCUREMENT OFFICER • Department of Transportation. Place of performance: MA. Response deadline: Mar 11, 2026. Industry: Source industry codes 30, 12, 00.

Source
Open on official portal →
Solicitation
BD-26-1030-CPO1-CPO1-125835
Performance
Park Plaza Boston, MA 02116
Response
Mar 11, 2026, 03:00 PM UTC
Open on official portal →
Map for MA
Live POP
Place of performance
Park Plaza Boston, MA 02116
State: MA
Contracting office
PLEASE REVIEW ATTACHMENTS 10 PARK PLAZA BOSTON, MA 02116 US

Point of Contact

Name
Michael Woods
Email
michael.p.woods@dot.state.ma.us
Phone
Not available

Agency & Office

Department
Department of Transportation
Agency
CPO1 - OFFICE OF THE CHIEF PROCUREMENT OFFICER
Subagency
CPO1 - OFFICE OF THE CHIEF PROCUREMENT OFFICER
Office
CPO1 - OFFICE OF THE CHIEF PROCUREMENT OFFICER
Contracting Office Address
PLEASE REVIEW ATTACHMENTS 10 PARK PLAZA BOSTON, MA 02116 US

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260018 (Rev 1)
Published May 18, 2026Massachusetts • Essex
24 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 22 more rate previews.
Davis-BaconBest fitstate match
MA20260018 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Essex
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Plymouth
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; POST DRIVER (GUARDRAIL/FENCES)
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD

Description

MassDOT Due Diligence Posting Road Tape

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 04, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Massachusetts Department of Transportation (MassDOT) is seeking proposals for Due Diligence Posting Road Tape, a project categorized under NAICS UNSPSC 30-12-00. Interested vendors must be eligible for the Small Business Participation Program (SBPP). The proposal deadline is set for March 11, 2026, providing ample time for preparation.

MassDOTDue DiligenceRoad TapeSBPPSmall Business Procurementsource codes 30, 12, 00
What the buyer is trying to do

MassDOT intends to procure road tape services to ensure compliance with due diligence requirements for road marking and safety.

Who should pursue this
  • Small businesses with experience in road marking and safety products
  • Companies registered under the Small Business Participation Program (SBPP)
  • Vendors with prior experience in governmental contracts
Work breakdown
  • Review project requirements for Due Diligence Posting Road Tape
  • Develop a proposal including pricing and timelines
  • Prepare compliance documentation for SBPP eligibility
  • Submit proposal before the March 11, 2026 deadline
Response package checklist
  • Complete proposal form
  • Provide pricing structure
  • Submit proof of SBPP eligibility
  • Include references from similar projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure compliance with all local and state regulations regarding road safety products
  • Verify SBPP eligibility before submission
Pricing strategy
  • Consider competitive pricing within the small business framework
  • Explore bulk pricing options if applicable
Teaming and subs
  • Collaborate with local small businesses to enhance proposal strength
  • Consider subcontracting specialists in road safety products
Risks and watchouts
  • Potential delays in materials sourcing affecting delivery timelines
  • Compliance issues with SBPP eligibility or project specifications
Smart questions to ask
  • What are the specific performance metrics required for road tape?
  • Are there other preferred vendors participating in this solicitation?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific performance metrics for road tape
  • Exact quantities needed for the project
  • Timeline for project completion after proposal acceptance
  • Details on previous contracts or performance measures
  • Information about competitors for strategic positioning
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-26-1030-CPO1-CPO1-125835
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans
Other matched support routes

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.