605276 BEVERLY Bridge Replacement, B-11-001, Bridge Street over Bass River (Hall-Whitaker Bridge)
Federal opportunity from Department of Transportation. Place of performance: MA. Response deadline: Jul 14, 2026.
- Source
- Open on official portal →
- Solicitation
- BD-27-1030-0H100-0H002-130081
- Performance
- MA
- Response
- Jul 14, 2026, 12:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 9 more rate previews.↓
Description
605276 BEVERLY Bridge Replacement, B-11-001, Bridge Street over Bass River (Hall-Whitaker Bridge)
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Department of Transportation is seeking bids for the repair of the Hall-Whitaker Bridge, specified as project number 605276. This bridge replacement project will focus on the Bridge Street over Bass River. Interested bidders should prepare to submit their proposals by July 14, 2026, providing a detailed plan for the reconstruction efforts.
The buyer is looking to replace the Hall-Whitaker Bridge to ensure safe and efficient transportation over the Bass River, thereby enhancing local infrastructure.
- Civil engineering firms
- Construction contractors with bridge experience
- Infrastructure development companies
- Project management
- Site assessments
- Engineering design
- Demolition of existing structure
- Construction of new bridge
- Inspection and quality control
- Detailed project timeline
- Budget estimate
- Experience with similar projects
- Safety and quality control plans
- Team qualifications
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Must adhere to state construction regulations
- Compliance with environmental assessments required
- Documentation of bonding and insurances needed
- Consider local market rates for labor and materials
- Factor in potential delays due to weather or permits
- Include contingency costs for unforeseen issues
- Potential partnership with local engineering firms for design
- Subcontracting specialized labor for bridge components
- Engagement of environmental consultants for compliance
- Potential delays in environmental permits
- Unforeseen site conditions upon demolition
- Budget overruns due to material price fluctuations
- What is the expected timeline for obtaining permits?
- Are there specific local regulations we need to be aware of?
- What safety standards are mandated for bridge construction?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific budget range for the project
- Details on environmental assessments needed
- Clarification on local regulations impacting construction
- Information about previous bridge condition assessments
- Potential funding sources for the project
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.