Skip to content
Division of Capital Asset Management and Maintenance

SDN2301 SDN - Securing IT and Med Trailers at Norfolk Sheriff, Dedham, MA.

Solicitation: BD-26-1019-DCP04-BID01-126958
Notice ID: ma_commbuys_e11ae7542e0d8501fb1b
Contract snapshot

Federal opportunity from Division of Capital Asset Management and Maintenance. Place of performance: MA. Response deadline: May 21, 2026.

Source
Open on official portal →
Solicitation
BD-26-1019-DCP04-BID01-126958
Performance
MA
Response
May 21, 2026, 02:00 PM UTC
Open on official portal →
Live POP
Place of performance
MA
Contracting office
Not listed

Point of Contact

Name
Rita Gorman
Email
Not available
Phone
Not available

Agency & Office

Department
Division of Capital Asset Management and Maintenance
Agency
Not available
Subagency
Not available
Office
Rita Gorman
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260018 (Rev 1)
Published May 18, 2026Massachusetts • Essex
24 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 22 more rate previews.
Davis-BaconBest fitstate match
MA20260018 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Essex
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Plymouth
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; POST DRIVER (GUARDRAIL/FENCES)
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD

Description

SDN2301 SDN - Securing IT and Med Trailers at Norfolk Sheriff, Dedham, MA.

Advisory bid range

Pricing and bid posture

medium confidence
$287,168 - $340,347

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$287,168
Target
$303,882
Premium
$340,347
Labor
$124,800
Direct
$53,000
Burden
$88,068
Fee + reserve
$35,814
Target $303,882Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 26, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The project involves replacing the existing medical administration trailer at the Norfolk County Sheriff’s Office with a new 1,000 square foot building addition. The scope includes the demolition of the current trailer and construction of the new addition with specified materials such as painted concrete block walls and steel roof joists. This opportunity is particularly relevant for contractors experienced in modular building and healthcare facility upgrades.

medical administration trailerNorfolk County Sheriffdemolitionbuilding additionhealthcare facility upgrade
What the buyer is trying to do

The buyer aims to enhance the medical administration facilities at the Norfolk County Sheriff's Office by constructing a new building addition that meets modern standards and improves service delivery.

Who should pursue this
  • Contractors specializing in modular construction
  • Firms with experience in healthcare facility renovations
  • Companies with capabilities in demolition and site preparation
Work breakdown
  • Demolition of the existing medical administration trailer
  • Construction of a new 1,000SF building addition
  • Pouring a new concrete slab for the addition
  • Installation of painted concrete block walls
  • Roof installation with steel joists and PVC membrane
Response package checklist
  • Completed proposal form
  • Cost estimate including labor and materials
  • Evidence of prior work in similar projects
  • Information on team members and qualifications
  • Safety and compliance certifications
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Must comply with local health and safety regulations
  • Adherence to building codes and permits required for new construction
Pricing strategy
  • Consider competitive pricing due to potential budget constraints
  • Include contingencies for unexpected demolition challenges
Teaming and subs
  • Subcontract with specialists in roofing and finishes
  • Partner with firms experienced in healthcare sector construction
Risks and watchouts
  • Potential delays due to unforeseen site conditions
  • Challenges in coordinating with existing site operations at the Sheriff's Office
Smart questions to ask
  • What is the timeline for the demolition and construction phases?
  • Are there specific design requirements or guidelines to follow?
  • Is there an existing contractor currently servicing the premises that needs to be accommodated?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific regulations or guidelines for healthcare facilities
  • Details on existing site conditions
  • Information on local labor availability
  • Clarification on any required permits prior to start
  • Potential budget range or funding details
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-26-1019-DCP04-BID01-126958
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.