Fire Alarm and Sprinkler System Improvements at State Aided Developments
Federal opportunity from Lynn Housing Authority & Neighborhood Development. Place of performance: MA. Response deadline: May 21, 2026.
- Source
- Open on official portal →
- Solicitation
- BD-24-1827-FISD1-PD001-128280
- Performance
- MA
- Response
- May 21, 2026, 03:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 22 more rate previews.↓
Description
Fire Alarm and Sprinkler System Improvements at State Aided Developments
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The LYNN HOUSING AUTHORITY & NEIGHBORHOOD DEVELOPMENT is seeking bids for Fire Alarm and Sprinkler System Improvements at three state-aided developments in Lynn, MA. The project encompasses work at Caggiano Plaza, McGee House, and Shepard & Warren, with details provided by MACRITCHIE ENGINEERING, INC. This opportunity is open for bids until May 21, 2026, providing ample time for detailed responses and accurate pricing strategies.
The buyer aims to improve fire safety systems at designated housing developments to ensure compliance with safety standards and enhance resident safety.
- General contractors with experience in fire safety systems
- Contractors with relevant licenses and insurance
- Companies experienced in working with housing authorities
- Site assessment at each location
- Installation of new fire alarm systems
- Installation of new sprinkler systems
- Testing and commissioning of installed systems
- Documentation and compliance checks with safety regulations
- Company profile and relevant experience
- Detailed pricing proposal
- Management plan for project timelines
- Proof of insurance and bonding
- References from similar projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Must comply with local fire safety regulations
- Work must meet standards set by MACRITCHIE ENGINEERING, INC.
- Bidders must adhere to state contracting laws
- Consider economies of scale for bulk material purchases
- Include costs for labor, materials, and compliance checks
- Account for potential delays in project timeline
- Local subcontractors specializing in fire safety systems
- Potential partnership with licensed electrical contractors
- Collaboration with engineering firms for compliance assurance
- Potential delays in obtaining permits
- Challenges in coordinating installations across multiple sites
- Compliance with varying local safety regulations
- What specific codes must the fire systems comply with?
- Are there existing systems that can be integrated with the new installations?
- What is the anticipated timeline for award and project initiation?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific budget or funding information for the project
- Details on existing fire systems
- Exact scope of work for each site
- Potential compliance issues or concerns
- Formal solicitation number and documentation
- Deadline for bidder questions
- Criteria for bid evaluation
- Site access constraints
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.