Skip to content
Department of Transportation

E22CN09 Mystic Junction, Chestnut St and Washington St Environmental Remediation Somerville, MA

Solicitation: BD-26-1206-31100-31102-128761
Notice ID: ma_commbuys_4a460ed89d845b2bad12
DepartmentDepartment of TransportationStateMAPostedDueMay 28, 2026, 02:00 PM UTCCloses in 2 daysBid range$316,256 - $374,822
Contract snapshot

Federal opportunity from Massachusetts Bay Transportation Authority. Place of performance: MA. Response deadline: May 28, 2026.

Source
Open on official portal →
Solicitation
BD-26-1206-31100-31102-128761
Performance
MA
Response
May 28, 2026, 02:00 PM UTC
Open on official portal →
Live POP
Place of performance
MA
Contracting office
Not listed

Point of Contact

Name
Elliot Silvia
Email
Not available
Phone
Not available

Agency & Office

Department
Massachusetts Bay Transportation Authority
Agency
Not available
Subagency
Not available
Office
Elliot Silvia
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260018 (Rev 1)
Published May 18, 2026Massachusetts • Essex
24 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 22 more rate previews.
Davis-BaconBest fitstate match
MA20260018 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Essex
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Plymouth
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; POST DRIVER (GUARDRAIL/FENCES)
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD

Description

E22CN09 Mystic Junction, Chestnut St and Washington St Environmental Remediation Somerville, MA

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: May 19, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Massachusetts Bay Transportation Authority is seeking proposals for environmental remediation at Mystic Junction, specifically at the intersections of Chestnut St and Washington St in Somerville, MA. The response deadline for this solicitation is set for May 28, 2026, and it falls under solicitation number BD-26-1206-31100-31102-128761. Interested bidders should ensure they meet all compliance and capability requirements to deliver effective remediation services.

Environmental remediationMassachusetts Bay Transportation AuthoritySomerville remediation projectE22CN09hazardous waste management
What the buyer is trying to do

The buyer aims to undertake environmental remediation in the specified area of Somerville, MA, ensuring compliance with environmental regulations and restoring the site.

Who should pursue this
  • Environmental consulting firms
  • Contractors with expertise in soil and water remediation
  • Firms experienced in projects under transportation authority guidelines
Work breakdown
  • Assessment of environmental conditions
  • Development of remediation plans
  • Implementation of remediation processes
  • Monitoring and reporting on remediation effectiveness
Response package checklist
  • Completed proposal form
  • Demonstration of previous experience in similar projects
  • Project timeline and milestones
  • Cost estimate and pricing breakdown
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Must comply with state environmental regulations
  • Certification of environmental remediation standards required
Pricing strategy
  • Consider competitive pricing while ensuring quality of remediation
  • Include a detailed breakdown of costs associated with various phases of the project
Teaming and subs
  • Partner with local environmental specialists
  • Collaborate with subcontractors specializing in hazardous waste management
Risks and watchouts
  • Potential regulatory changes impacting project scope
  • Unforeseen environmental conditions may increase costs
Smart questions to ask
  • What specific environmental issues are expected at the site?
  • Are there any existing studies or reports on the site conditions?
  • What is the planned duration for the response evaluation process?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed scope of the specific environmental issues to be addressed
  • Existing environmental assessments or studies
  • Preferred contractors or subcontractors already on board
  • Budget range for the project
  • Compliance standards specific to this project
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-26-1206-31100-31102-128761
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans
Other matched support routes

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.