Skip to content
Department of Transportation

P90CN02 On Call Duct Bank, Manhole, & Cable Renewal, Systemwide, MA

Solicitation: BD-26-1206-MBTA-MBTA-129107
Notice ID: ma_commbuys_3cacd925d71c5128b746
DepartmentDepartment of TransportationStateMAPostedDueJun 04, 2026, 02:00 PM UTCCloses in 9 daysBid range$316,256 - $374,822
Contract snapshot

Federal opportunity from Massachusetts Bay Transportation Authority. Place of performance: MA. Response deadline: Jun 04, 2026.

Source
Open on official portal →
Solicitation
BD-26-1206-MBTA-MBTA-129107
Performance
MA
Response
Jun 04, 2026, 02:00 PM UTC
Open on official portal →
Live POP
Place of performance
MA
Contracting office
Not listed

Point of Contact

Name
TYLER SCOTT
Email
Not available
Phone
Not available

Agency & Office

Department
Massachusetts Bay Transportation Authority
Agency
Not available
Subagency
Not available
Office
TYLER SCOTT
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260018 (Rev 1)
Published May 18, 2026Massachusetts • Essex
24 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 22 more rate previews.
Davis-BaconBest fitstate match
MA20260018 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Essex
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Plymouth
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; POST DRIVER (GUARDRAIL/FENCES)
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD

Description

P90CN02 On Call Duct Bank, Manhole, & Cable Renewal, Systemwide, MA. Solicitation notice from Massachusetts Bay Transportation Authority. Review the official posting for scope, requirements, and submission details.

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: May 24, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Massachusetts Bay Transportation Authority (MBTA) is seeking proposals for the P90CN02 On Call Duct Bank, Manhole, & Cable Renewal project. This systemwide initiative aims to enhance the duct bank and cable infrastructure across Massachusetts. Proposals are due by June 4, 2026, providing ample time for strategic bidding and planning.

Duct Bank RenewalManhole ConstructionCable InfrastructureMassachusetts Bay Transportation Authority
What the buyer is trying to do

MBTA aims to renew and enhance existing duct bank, manhole, and cable systems to ensure reliable transportation infrastructure throughout Massachusetts.

Who should pursue this
  • Contractors with experience in civil engineering
  • Companies specializing in cable installation and renewal
  • Firms with a strong track record in infrastructure projects
Work breakdown
  • Assessment of existing duct bank and manhole conditions
  • Renewal of cable infrastructure
  • Ongoing maintenance and operational support
  • Systemwide project management and coordination
Response package checklist
  • Completed proposal form
  • Demonstration of past project experience
  • Team qualifications and bios
  • Technical approach to the work outlined
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure adherence to local and state guidelines
  • Follow all procurement policies set by MBTA
Pricing strategy
  • Consider competitive pricing while ensuring value for performance
  • Evaluate costs related to labor, materials, and project overhead
Teaming and subs
  • Consider partnering with local infrastructure specialists
  • Engage subcontractors with specific expertise in duct bank technologies
Risks and watchouts
  • Potential delays in project execution due to regulatory hurdles
  • Challenges related to existing infrastructure conditions
  • Variability in material costs impacting overall project budget
Smart questions to ask
  • What is the current condition of the existing duct banks and manholes?
  • Are there specific areas of concern that require more attention?
  • What are the expected project milestones and reporting requirements?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific budget for the project
  • Details on existing infrastructure conditions
  • Potential subcontractor opportunities
  • Evaluation criteria for proposals
  • Information on previous contracts of similar nature
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-26-1206-MBTA-MBTA-129107
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans
Other matched support routes

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.