MWRA Contract No. 7217 Interceptor Renewal No. 7 Malden/Melrose Sections 37/41/42/49/54/65
Federal opportunity from Massachusetts Water Resources Authority. Place of performance: MA. Response deadline: May 20, 2026.
- Source
- Open on official portal →
- Solicitation
- BD-19-1212-MWRA-DITP-127776
- Performance
- MA
- Response
- May 20, 2026, 02:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 22 more rate previews.↓
Description
MWRA Contract No. 7217 Interceptor Renewal No. 7 Malden/Melrose Sections 37/41/42/49/54/65
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The MWRA has issued a notice for Contract No. 7217, which involves the Interceptor Renewal for specific sections in Malden and Melrose, scheduled for completion by May 20, 2026. This project includes multiple sections (37, 41, 42, 49, 54, and 65), making it a significant infrastructure initiative. Bidders should review details from the provided link to align their proposals with MWRA's requirements.
The MWRA aims to renew and upgrade interceptor sections in Malden and Melrose, improving the wastewater management infrastructure in these areas.
- Companies specializing in wastewater management
- Civil engineering firms with interceptor renewal experience
- Contractors with relevant infrastructure project history
- Review project specifications and requirements from MWRA
- Conduct site assessments in Malden and Melrose
- Develop engineering designs for interceptor renewal
- Prepare cost estimates and pricing strategy
- Create a project timeline for execution
- Compile a compliance strategy for environmental regulations
- Completed proposal form
- Detailed project timeline and phases
- Cost proposal including breakdown
- Relevant project experience documentation
- List of key personnel and their qualifications
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure adherence to Massachusetts environmental regulations
- Review any applicable local permits relating to construction
- Consider competitive pricing relative to prior projects of similar scope
- Factor in material and labor inflation rates leading up to 2026
- Local subcontractors familiar with MWRA processes
- Environmental compliance specialists
- Engineering consultants with wastewater expertise
- Delays in obtaining necessary permits may impact project timelines
- Potential for unexpected site conditions leading to cost overruns
- Changes in regulatory requirements affecting project scope
- What specific materials are approved for use in the interceptor renewal?
- Are there any existing contract limitations or expectations from the MWRA?
- What is the anticipated review and approval timeline for submitted proposals?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific budget range for the project
- Detailed technical specifications for the interceptor
- Exact deliverables expected at each project phase
- Information on site accessibility and working conditions
- Required licensing or certifications for bidding
- Details on subcontracting limitations
- Assessment of current infrastructure conditions
- History of similar projects undertaken by MWRA
Service match
Optional support routes matched to this notice after the core solicitation details.
Other matched support routes↓
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.