Skip to content
Massachusetts Water Resources Authority

MWRA Contract No. 7217 Interceptor Renewal No. 7 Malden/Melrose Sections 37/41/42/49/54/65

Solicitation: BD-19-1212-MWRA-DITP-127776
Notice ID: ma_commbuys_d6039f0b45849801c9b0
Contract snapshot

Federal opportunity from Massachusetts Water Resources Authority. Place of performance: MA. Response deadline: May 20, 2026.

Source
Open on official portal →
Solicitation
BD-19-1212-MWRA-DITP-127776
Performance
MA
Response
May 20, 2026, 02:00 PM UTC
Open on official portal →
Live POP
Place of performance
MA
Contracting office
Not listed

Point of Contact

Name
Barbie Aylward
Email
Not available
Phone
Not available

Agency & Office

Department
Massachusetts Water Resources Authority
Agency
Not available
Subagency
Not available
Office
Barbie Aylward
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260018 (Rev 1)
Published May 18, 2026Massachusetts • Essex
24 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 22 more rate previews.
Davis-BaconBest fitstate match
MA20260018 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Essex
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Plymouth
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; POST DRIVER (GUARDRAIL/FENCES)
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD

Description

MWRA Contract No. 7217 Interceptor Renewal No. 7 Malden/Melrose Sections 37/41/42/49/54/65

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Apr 15, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The MWRA has issued a notice for Contract No. 7217, which involves the Interceptor Renewal for specific sections in Malden and Melrose, scheduled for completion by May 20, 2026. This project includes multiple sections (37, 41, 42, 49, 54, and 65), making it a significant infrastructure initiative. Bidders should review details from the provided link to align their proposals with MWRA's requirements.

Interceptor RenewalMaldenMelroseMWRAWastewater ManagementCivil EngineeringInfrastructure Project
What the buyer is trying to do

The MWRA aims to renew and upgrade interceptor sections in Malden and Melrose, improving the wastewater management infrastructure in these areas.

Who should pursue this
  • Companies specializing in wastewater management
  • Civil engineering firms with interceptor renewal experience
  • Contractors with relevant infrastructure project history
Work breakdown
  • Review project specifications and requirements from MWRA
  • Conduct site assessments in Malden and Melrose
  • Develop engineering designs for interceptor renewal
  • Prepare cost estimates and pricing strategy
  • Create a project timeline for execution
  • Compile a compliance strategy for environmental regulations
Response package checklist
  • Completed proposal form
  • Detailed project timeline and phases
  • Cost proposal including breakdown
  • Relevant project experience documentation
  • List of key personnel and their qualifications
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure adherence to Massachusetts environmental regulations
  • Review any applicable local permits relating to construction
Pricing strategy
  • Consider competitive pricing relative to prior projects of similar scope
  • Factor in material and labor inflation rates leading up to 2026
Teaming and subs
  • Local subcontractors familiar with MWRA processes
  • Environmental compliance specialists
  • Engineering consultants with wastewater expertise
Risks and watchouts
  • Delays in obtaining necessary permits may impact project timelines
  • Potential for unexpected site conditions leading to cost overruns
  • Changes in regulatory requirements affecting project scope
Smart questions to ask
  • What specific materials are approved for use in the interceptor renewal?
  • Are there any existing contract limitations or expectations from the MWRA?
  • What is the anticipated review and approval timeline for submitted proposals?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific budget range for the project
  • Detailed technical specifications for the interceptor
  • Exact deliverables expected at each project phase
  • Information on site accessibility and working conditions
  • Required licensing or certifications for bidding
  • Details on subcontracting limitations
  • Assessment of current infrastructure conditions
  • History of similar projects undertaken by MWRA
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-19-1212-MWRA-DITP-127776
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans
Other matched support routes

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.