Skip to content
Massachusetts Water Resources Authority

MWRA Contract No. 8138 Lonergan Intake Facility (Shaft 8) Walkway and Wall Improvements

Solicitation: BD-19-1212-MWRA-DITP-130613
Notice ID: ma_commbuys_696d598ae2b055f4f56c
Source codes72, 13, 00DepartmentMassachusetts Water Resources AuthorityAgencyMWRA - Massachusetts Water Resource AuthorityStateMAPostedJun 17, 2026, 11:00 AM UTCDueSep 02, 2026, 02:00 PM UTCCloses in 74 daysBid range$432,739 - $512,876
Contract snapshot

Federal opportunity from MWRA - Massachusetts Water Resource Authority • Massachusetts Water Resources Authority. Place of performance: MA. Response deadline: Sep 02, 2026. Industry: Source industry codes 72, 13, 00.

Source
Open on official portal →
Solicitation
BD-19-1212-MWRA-DITP-130613
Performance
DITP - Deer Island
Response
Sep 02, 2026, 02:00 PM UTC
Open on official portal →
Live POP
Place of performance
DITP - Deer Island
Contracting office
Not listed

Point of Contact

Name
Eve.strother
Email
Eve.strother@mwra.com
Phone
Not available

Agency & Office

Department
Massachusetts Water Resources Authority
Agency
MWRA - Massachusetts Water Resource Authority
Subagency
MWRA - Massachusetts Water Resource Authority
Office
DITP - Deer Island
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260025 (Rev 1)
Published May 18, 2026Massachusetts • Worcester
25 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 23 more rate previews.
Davis-BaconBest fitstate match
MA20260025 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Worcester
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260021 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Middlesex
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260012 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Plymouth
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (DUCT, PIPE, & MECHANICAL SYSTEM INSULATION)
Base $55.45Fringe $36.63
Rate
BRICKLAYER (INCLUDES POINTING, CAULKING, CLEANING, AND WATERPROOFING)
Base $64.50Fringe $37.54
Rate
TILE SETTER
Base $64.52Fringe $37.51
+15 more occupation rates in this WD
Davis-Baconstate match
MA20260008 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Bristol, Dukes +6
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
RO, NORTON, RAYNHAM, REHOBOTH, SEEKONK, TAUNTON); NORFOLK, (BELLINGHAM, CANTON, DEDHAM, FOXBORO, FRANKLIN, NORFOLK, NORWOOD, PLAINVILLE, SHARON, WALPOLE, WESTRWOOD, WRENTHAM); AND PLYMOUTH (LAKEVILLE))
Base $60.35Fringe $34.40
Rate
BOXBORO, CARLISLE, CHEMSFORD, DRACUT, DUNSTABALE, FT DEVENS, GROTON, LITTLETON, LOWELL, NORTH ACTON, PEPPERELL, SHIRLEY, SOUTH ACTON, TEWKSBURY, TOWNSEND, TYNGSBORO, WEST ACTON, WESTFORD, WILMINGTON))
Base $58.21Fringe $33.71
+109 more occupation rates in this WD

Description

Contractor Category: General Building Construction

Advisory bid range

Pricing and bid posture

medium confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$1,709,381,432
Sector total $1,709,381,432 • Share 100.0%
Live
Median
$103,788
P10–P90
$28,887$3,400,257
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,709,381,432)
Deal sizing
$103,788 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-19-1212-MWRA-DITP-130613
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans
Other matched support routes

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.