Skip to content
Massachusetts Water Resources Authority

RFQ/P for Technical Assistance to the South Boston Neighborhood Working Group in the Review of Three

Solicitation: S4482-vCurrent
Notice ID: ma_commbuys_b25a49d9bbc4c9826afd
DepartmentMassachusetts Water Resources AuthorityStateMAPostedDueDec 31, 2099, 12:00 AM UTCCloses in 26882 daysBid range$316,256 - $374,822
Contract snapshot

Federal opportunity from Massachusetts Water Resources Authority. Place of performance: MA. Response deadline: Dec 31, 2099.

Source
Open on official portal →
Solicitation
S4482-vCurrent
Performance
MA
Response
Dec 31, 2099, 12:00 AM UTC
Open on official portal →
Live POP
Place of performance
MA
Contracting office
Not listed

Point of Contact

Name
eProcurement Solicitation
Email
Not available
Phone
Not available

Agency & Office

Department
Massachusetts Water Resources Authority
Agency
Not available
Subagency
Not available
Office
eProcurement Solicitation
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260018 (Rev 1)
Published May 18, 2026Massachusetts • Essex
24 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 22 more rate previews.
Davis-BaconBest fitstate match
MA20260018 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Essex
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Plymouth
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; POST DRIVER (GUARDRAIL/FENCES)
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD

Description

RFQ/P for Technical Assistance to the South Boston Neighborhood Working Group in the Review of Three

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 18, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

This opportunity involves a request for qualification/proposal (RFQ/P) for technical assistance directed at the South Boston Neighborhood Working Group, specifically aimed at reviewing three significant elements. The deadline for responses is set for December 31, 2099, providing an extended timeline for interested bidders. This initiative is issued by the Default Data Conversion Department (1212CONVD), indicating a structured process for procurement in local community development.

Technical AssistanceNeighborhood Working GroupCommunity DevelopmentProposalSouth Boston
What the buyer is trying to do

The buyer aims to procure technical assistance to support the South Boston Neighborhood Working Group in effectively reviewing three unspecified elements related to their community initiatives.

Who should pursue this
  • Technical assistance providers with a track record in community engagement and local governance.
Work breakdown
  • Identify the specific needs of the South Boston Neighborhood Working Group.
  • Develop a framework for technical assistance rendering.
  • Provide comprehensive analysis and review for the specified three components.],
  • who_should_bid:[
  • Consulting firms with experience in community development and neighborhood initiatives.
  • Organizations specialized in data analysis and neighborhood assessments.
Response package checklist
  • Detailed proposal outlining the approach and methodology.
  • Background information and capabilities of the bidding organization.
  • References or case studies from similar projects.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure all qualifications align with RFQ/P requirements set forth by the Default Data Conversion Department.
  • Submissions must respect any local regulations concerning community engagement.
Pricing strategy
  • Competitive pricing will be essential due to the long timeline; consider phased deliverables.
  • Ensure transparency in cost breakdowns to facilitate evaluation by the buyer.
Teaming and subs
  • Consider partnering with local firms that have established relationships within the South Boston community.
  • Potential collaboration with organizations that provide grassroots community engagement expertise.
Risks and watchouts
  • Extended response deadline may lead to increased competition and pricing pressures.
  • Ambiguity in the scope of 'three elements' could lead to misaligned proposals.
Smart questions to ask
  • What specific areas are encompassed by the 'three elements' mentioned for review?
  • What metrics will be used to evaluate the technical assistance proposals?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific details of the three elements to be reviewed.
  • Budget constraints for the technical assistance service.
  • Scoring criteria for proposal evaluation.
  • Expected outcomes from the technical assistance.
  • Any prerequisites for bidders regarding previous work.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice S4482-VCURRENT
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans
Other matched support routes

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.