Skip to content
Military Division

NOTICE: 240918 Install VRF Mini Split System at Building 2816 (Camp Edwards, MA)

Solicitation: BD-26-1069-MILDV-30000-128121
Notice ID: ma_commbuys_db6191099aad629992ee
Source codes72, 15, 12, 10, 22, 23Set-AsideSBPP Eligible: NODepartmentMilitary DivisionAgencyMILDV - Military DivisionStateMAPostedApr 15, 2026, 10:00 AM UTCDueMay 14, 2026, 09:00 AM UTCExpiredBid range$432,739 - $512,876
Contract snapshot

Federal opportunity from MILDV - Military Division • Military Division. Place of performance: MA. Response deadline: May 14, 2026. Industry: Source industry codes 72, 15, 12, 10, 22, 23.

Source
Open on official portal →
Solicitation
BD-26-1069-MILDV-30000-128121
Performance
Beamon St Camp Edwards, MA 02542
Response
May 14, 2026, 09:00 AM UTC
Open on official portal →
Map for MA
Live POP
Place of performance
Beamon St Camp Edwards, MA 02542
State: MA
Contracting office
Mia Kochka 3468 Beamon St Camp Edwards, MA 02542 US

Point of Contact

Name
Not available
Email
Not available
Phone
(857) 248-6382

Agency & Office

Department
Military Division
Agency
MILDV - Military Division
Subagency
MILDV - Military Division
Office
30000 - CFMO - CAMP EDWARDS
Contracting Office Address
Mia Kochka 3468 Beamon St Camp Edwards, MA 02542 US

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260018 (Rev 1)
Published May 18, 2026Massachusetts • Essex
24 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 22 more rate previews.
Davis-BaconBest fitstate match
MA20260018 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Essex
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Plymouth
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; POST DRIVER (GUARDRAIL/FENCES)
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD

Description

Project will be eHosted and eBid at www.BidDocs.com. Supply materials, labor, equipment and supervision to install a VRF system in the first floor of building 2816 Richardson Rd, Camp Edwards, MA. FSBs will include Electrical Work.

Advisory bid range

Pricing and bid posture

medium confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Apr 16, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The MILDV is seeking proposals for the installation of a VRF Mini Split System at Building 2816, Camp Edwards, MA. This opportunity specifically requires providing materials, labor, equipment, and supervision. The deadline for responses is May 14, 2026, and the project involves electrical work as part of the scope.

VRF Mini Split SystemHVAC installationelectrical workCamp EdwardsMILDVsource codes 72, 15, 12, 10, 22, 23
What the buyer is trying to do

The buyer aims to procure installation services for a VRF Mini Split System, including necessary electrical work and project supervision.

Who should pursue this
  • Contractors specializing in HVAC installations
  • Electrical contractors with experience in VRF systems
  • Companies with a proven track record in military or government projects
Work breakdown
  • Supply materials for the VRF system installation
  • Provide labor for the installation process
  • Equip the site with necessary tools and equipment
  • Supervise the installation process
  • Complete required electrical work
Response package checklist
  • Completed proposal form
  • Company qualifications and relevant project experience
  • Detailed pricing breakdown
  • Timeline for project completion
  • Certifications and licenses related to HVAC and electrical work
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Must adhere to local building codes
  • Follow safety regulations applicable to military installations
Pricing strategy
  • Consider competitive pricing due to potential for multiple bidders
  • Build in contingencies for project delays or unforeseen complications
Teaming and subs
  • Consider partnering with electrical subcontractors
  • Look for firms with government contracting experience
Risks and watchouts
  • Potential delays in material procurement due to supply chain issues
  • Compliance with military installation security protocols
  • Risk of scope changes impacting cost and timeline
Smart questions to ask
  • What are the specific electrical requirements for the installation?
  • Are there any site access restrictions at Camp Edwards?
  • What is the expected timeline for project approvals?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific codes or regulations for the installation
  • Details on warranty requirements for installed systems
  • Clarification on project supervision responsibilities
  • Information on allowable subcontracting
  • Any specific environmental considerations for the installation
  • Details on warranty and maintenance requirements post-installation
  • Potential for phased installation or work schedules
  • Information on bid evaluation criteria
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-26-1069-MILDV-30000-128121
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.