ITB 240795 Install Boiler Vents at the 5500 Area (Camp Edwards, MA)
Federal opportunity from Military Division. Place of performance: MA. Response deadline: May 28, 2026.
- Source
- Open on official portal →
- Solicitation
- BD-26-1069-MILDV-30000-129322
- Performance
- MA
- Response
- May 28, 2026, 10:00 AM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 5 more rate previews.↓
Description
ITB 240795 Install Boiler Vents at the 5500 Area (Camp Edwards, MA)
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Military Division is seeking bids for ITB 240795 to install boiler vents at the 5500 Area in Camp Edwards, MA. Proposals are due by May 27, 2026, at 10:00 AM. This project potentially involves significant physical installation work and may require specialized contractors familiar with heating and ventilation systems in military environments.
The buyer is aiming to enhance infrastructure efficiency by installing new boiler vents, which suggests a focus on energy management and system performance improvements.
- Contractors specializing in HVAC systems
- Companies with prior experience in military installations
- Local contractors familiar with Camp Edwards
- Site assessment and preparation
- Installation of boiler vent systems
- Post-installation inspection and testing
- Documentation and compliance checks
- Completed bid form
- Technical proposal outlining installation approach
- Cost estimate breakdown
- Evidence of prior similar project experience
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Must adhere to all military installation regulations
- Ensure all personnel have appropriate security clearances
- Consider competitive local pricing
- Account for potential delays in military scheduling
- Include costs for any required testing and certification
- Partner with local HVAC subcontractors for expertise
- Engage with logistics firms for materials procurement
- Potential delays due to security clearance processing
- Unforeseen site conditions after project commencement
- Approval timelines from military oversight bodies
- What specific requirements does the Military Division have regarding compliance?
- Are there known site conditions we should prepare for?
- What is the expected timeline for decision-making after submission?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed specifications for boiler vents
- Relevant historical performance data for similar projects
- Site conditions and restrictions at Camp Edwards
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.