Skip to content
New Bedford Housing Authority

Siding Replacement Phase 4 - Blue Meadows

Solicitation: BD-22-1221-MOD00-MOD-128313
Notice ID: ma_commbuys_21e516f395741e43aca2
Contract snapshot

Federal opportunity from New Bedford Housing Authority. Place of performance: MA. Response deadline: May 21, 2026.

Source
Open on official portal →
Solicitation
BD-22-1221-MOD00-MOD-128313
Performance
MA
Response
May 21, 2026, 10:00 AM UTC
Open on official portal →
Live POP
Place of performance
MA
Contracting office
Not listed

Point of Contact

Name
MARY-ELLEN FAGAN
Email
Not available
Phone
Not available

Agency & Office

Department
New Bedford Housing Authority
Agency
Not available
Subagency
Not available
Office
MARY-ELLEN FAGAN
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260018 (Rev 1)
Published May 18, 2026Massachusetts • Essex
24 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 22 more rate previews.
Davis-BaconBest fitstate match
MA20260018 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Essex
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Plymouth
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; POST DRIVER (GUARDRAIL/FENCES)
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD

Description

Siding Replacement Phase 4 - Blue Meadows

Advisory bid range

Pricing and bid posture

medium confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Apr 22, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Siding Replacement Phase 4 at Blue Meadows involves the comprehensive removal and replacement of siding and trim, alongside the abatement of underlayment and installation of continuous insulation at the building envelope. This project is associated with the MOD001 - Modernization agency and is set in New Bedford, MA, with a response deadline of May 21, 2026. Interested bidders should review the provided attachments for detailed specifications.

Siding replacementBuilding envelope insulationCommercial constructionAbatement servicesNew Bedford MA
What the buyer is trying to do

The buyer is seeking qualified contractors to complete a siding replacement project that includes significant removal, replacement, and insulation work at a state-aided development facility.

Who should pursue this
  • Contractors specializing in siding installation and replacement
  • Companies with experience in building envelope insulation
  • Firms capable of handling abatement tasks
Work breakdown
  • Removal of existing siding and trim
  • Replacement of siding and trim
  • Abatement of underlayment in select areas
  • Installation of continuous insulation at building envelope
  • Roofing and flashing work (sub bid)
Response package checklist
  • Completed proposal form
  • Proof of bonding capacity
  • List of relevant project experience
  • Staff resumes
  • Evidence of insurance coverage
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Must comply with local and state building codes
  • Adherence to safety and environmental regulations for abatement work
Pricing strategy
  • Consider competitive pricing due to tight budget constraints on state-aided projects
  • Estimate costs for materials and labor accurately based on the project's scope
Teaming and subs
  • Teaming with abatement specialists to ensure compliance with regulations
  • Potential partnership with insulation suppliers for efficiency
  • Including subcontractors for roofing and flashing tasks
Risks and watchouts
  • Unexpected costs due to underlying structural issues not visible before work begins
  • Delays due to weather conditions affecting outdoor work
  • Potential changes in regulations or compliance requirements
Smart questions to ask
  • What specific materials are preferred or approved for this project?
  • Are there any existing issues at the site that could complicate the project?
  • What is the expected timeline for the project?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed specifications for materials and methods
  • Estimated budget range for the project
  • Information on pre-bid meetings or site visits
  • Clarification on bonding requirements
  • Any specific certifications needed for contractors
  • Details on sub bid requirements for roofing and flashing
  • Information on whether this project has phases or multiple locations
  • Technical details on the abatement process
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-22-1221-MOD00-MOD-128313
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.