SUST LED Light Fixtures
Federal opportunity from Pembroke Housing Authority. Place of performance: MA. Response deadline: May 28, 2026.
- Source
- Open on official portal →
- Solicitation
- BD-17-1904-MOD01-MOD01-128752
- Performance
- MA
- Response
- May 28, 2026, 02:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 22 more rate previews.↓
Description
SUST LED Light Fixtures
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The opportunity focuses on replacing existing light fixtures with LED light fixtures for the MOD01 - Modernization Department, with a deadline for bids set for May 28, 2026. Bidders will need to submit their proposals electronically via biddocs.com, emphasizing the importance of understanding the registration process for electronic bidding. This project falls under NAICS codes 72 and 13, indicating potential relevance to both construction and manufacturing sectors.
The buyer aims to modernize lighting by replacing obsolete fixtures with energy-efficient LED options, alongside necessary electrical upgrades.
- Companies specializing in electrical contracting
- Firms experienced in LED lighting installation
- Contractors with a strong track record in modernization projects
- Replacement of existing light fixtures
- Installation of LED light fixtures
- Completion of related electrical work
- Completed electronic bid forms
- Evidence of familiarity with LED installations
- Documentation of previous relevant work experience
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure compliance with electronic bidding requirements
- Adhere to submission deadlines
- Review the specific instructions in bid documents
- Consider competitive pricing due to potential for multiple bidders
- Include costs for materials and labor
- Factor in any warranties or post-installation support
- Partner with electrical subcontractors for technical expertise
- Engage LED manufacturers for quality assurance
- Collaborate with firms experienced in digital project bids
- Potential issues with technological barriers in electronic bidding
- Delays in procurement of LED fixtures
- Compliance with local electrical codes
- What are the specific requirements for the electronic bid submission?
- Are there any preferred brands or specifications for the LED light fixtures?
- What is the expected timeline for project completion?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Details on the budget or funding limits
- Information on specific LED fixture requirements
- Regulations governing the electrical work to be performed
- Timeline for project commencement and completion
- Information on the potential for post-installation support
- Local codes or regulations affecting the project
- Whether there are existing electrical issues to be addressed
- Specifications for the electrical work required
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.