Skip to content
Taunton Municipal Lighting Plant

Request for Qualifications - Owner's Project Manager Services

Solicitation: BD-16-1785-TMLP1-TMLP-128975
Notice ID: ma_commbuys_2e44ce633fdac6883c57
DepartmentTaunton Municipal Lighting PlantStateMAPostedDueJun 19, 2026, 11:00 AM UTCCloses in 24 daysBid range$316,256 - $374,822
Contract snapshot

Federal opportunity from Taunton Municipal Lighting Plant. Place of performance: MA. Response deadline: Jun 19, 2026.

Source
Open on official portal →
Solicitation
BD-16-1785-TMLP1-TMLP-128975
Performance
MA
Response
Jun 19, 2026, 11:00 AM UTC
Open on official portal →
Live POP
Place of performance
MA
Contracting office
Not listed

Point of Contact

Name
Amy Kelley
Email
Not available
Phone
Not available

Agency & Office

Department
Taunton Municipal Lighting Plant
Agency
Not available
Subagency
Not available
Office
Amy Kelley
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260018 (Rev 1)
Published May 18, 2026Massachusetts • Essex
24 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 22 more rate previews.
Davis-BaconBest fitstate match
MA20260018 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Essex
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Plymouth
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; POST DRIVER (GUARDRAIL/FENCES)
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD

Description

Request for Qualifications - Owner's Project Manager Services

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: May 17, 2026
Client-ready brief
Executive summary
medium confidencegpt 5.2

Taunton Municipal Lighting Plant (TMLP1) is soliciting a Request for Qualifications for an Owner’s Project Manager to provide management services related to TMLP’s building project. The solicitation number is BD-16-1785-TMLP1-TMLP-128975 and the notice was posted 2026-05-08. Responses are due by 2026-06-19 11:00 UTC. Interested firms must email purchasing@tmlp.com to request the bid package, which likely contains the detailed scope, submission instructions, and evaluation criteria.

Owner's Project ManagerOPM servicesOwner's representativeProject management servicesBuilding projectTaunton Municipal Lighting PlantBD-16-1785-TMLP1-TMLP-128975
What the buyer is trying to do

Select a qualified Owner’s Project Manager (OPM) to manage TMLP’s building project on the owner’s behalf, using an RFQ process focused on qualifications and project management capability rather than a fully price-driven bid.

Who should pursue this
  • Owner’s Project Manager / owner’s representative firms with demonstrable experience managing public-sector building projects
  • Construction/project management consultants prepared to follow an RFQ (qualifications-based) selection process for TMLP
Work breakdown
  • Request and review the bid package by emailing purchasing@tmlp.com
  • Provide Owner’s Project Manager services for TMLP’s building project (project management / owner’s representation)
  • Prepare and submit an RFQ response aligned to BD-16-1785-TMLP1-TMLP-128975 instructions
Response package checklist
  • Confirmation the bid package was obtained via purchasing@tmlp.com and all instructions are followed
  • Statement of Qualifications tailored to Owner’s Project Manager services for TMLP’s building project
  • Relevant project experience / past performance for similar building projects (owner’s rep/OPM role)
  • Key personnel assignments and roles for the OPM function
  • Project approach for management services (aligned to the bid package scope once received)
  • Any required forms/certifications specified in the bid package for solicitation BD-16-1785-TMLP1-TMLP-128975
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Deadline: 2026-06-19 11:00 UTC
  • Bid package must be requested by email: purchasing@tmlp.com
  • Follow the submission format and any mandatory forms contained in the bid package for BD-16-1785-TMLP1-TMLP-128975
Pricing strategy
  • This is an RFQ; pricing requirements (if any) are not stated in the notice and should be confirmed in the bid package before committing to a rate/fee structure.
Teaming and subs
  • If the bid package indicates specialty needs (e.g., scheduling, cost estimating, constructability), consider teaming with niche consultants to strengthen the qualifications response without diluting OPM accountability.
Risks and watchouts
  • Scope ambiguity: the public notice only says “management services relating to TMLP’s building project”; the actual deliverables, contract type, and responsibilities are unknown until the bid package is obtained
  • Submission risk: missing bid-package-specific forms, formatting, or delivery instructions could render the RFQ response noncompliant
  • Timeline risk: limited time between 2026-05-08 posting and 2026-06-19 deadline if the bid package is requested late
Smart questions to ask
  • What are the specific OPM responsibilities and deliverables for the TMLP building project (e.g., schedule management, cost control, procurement support, construction administration)?
  • What is the anticipated project timeline and the expected duration of OPM services (period of performance)?
  • What is the evaluation criterion and selection process for this RFQ (shortlisting, interviews, scoring weights)?
  • Is pricing required at RFQ stage, and if so, what pricing format is required (hourly rates, fee proposal, not-to-exceed)?
  • What are the required submission method and format (email/portal/hard copy), and are there any mandatory forms or certifications?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Bid package contents (detailed scope, deliverables, submission instructions, and evaluation criteria)
  • Place of performance / project location
  • Period of performance (start/end dates)
  • Contract type and whether pricing is required at RFQ stage
  • Project details (building type, size, budget, delivery method, current phase)
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-16-1785-TMLP1-TMLP-128975
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.