Skip to content
Town of Andover

Sanborn Elementary Rooftop Solar, IFB 185/025/26

Solicitation: BD-24-1240-TOA01-TOA01-128944
Notice ID: ma_commbuys_537f7ca50f17376773e7
DepartmentTown of AndoverStateMAPostedDueMay 28, 2026, 11:00 AM UTCCloses in 2 daysBid range$432,739 - $512,876
Contract snapshot

Federal opportunity from Town of Andover. Place of performance: MA. Response deadline: May 28, 2026.

Source
Open on official portal →
Solicitation
BD-24-1240-TOA01-TOA01-128944
Performance
MA
Response
May 28, 2026, 11:00 AM UTC
Open on official portal →
Live POP
Place of performance
MA
Contracting office
Not listed

Point of Contact

Name
Janet Brewer
Email
Not available
Phone
Not available

Agency & Office

Department
Town of Andover
Agency
Not available
Subagency
Not available
Office
Janet Brewer
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260018 (Rev 1)
Published May 18, 2026Massachusetts • Essex
24 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 22 more rate previews.
Davis-BaconBest fitstate match
MA20260018 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Essex
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Plymouth
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; POST DRIVER (GUARDRAIL/FENCES)
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD

Description

Sanborn Elementary Rooftop Solar, IFB 185/025/26

Advisory bid range

Pricing and bid posture

medium confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: May 24, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Town of Andover is soliciting bids for the installation of a rooftop solar system at Sanborn Elementary, as outlined in IFB 185/025/26. The submission deadline is set for May 28, 2026, making it crucial for bidders to prepare their proposals well in advance. This project presents an opportunity for firms experienced in solar installations and education sector projects, emphasizing sustainability in local government initiatives.

rooftop solarSanborn ElementaryAndoversolar installationrenewable energy
What the buyer is trying to do

The Town of Andover aims to implement solar energy solutions at Sanborn Elementary to enhance energy efficiency and sustainability.

Who should pursue this
  • Companies specializing in solar energy installations
  • Firms with experience in educational institution projects
  • Contractors with a history of working on municipal contracts
Work breakdown
  • Site assessment and analysis
  • Design of solar system layout
  • Installation of solar panels
  • Electrical connections and integrations
  • Compliance with local regulations
Response package checklist
  • Completed bid form
  • Detailed project proposal
  • Cost estimation breakdown
  • Timeline for project completion
  • References from past solar projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure all installations meet local building codes
  • Follow state and federal regulations for solar energy systems
Pricing strategy
  • Consider competitive pricing while accounting for quality materials and installation standards
  • Factor in potential maintenance or warranty agreements
Teaming and subs
  • Partnerships with local subcontractors for installation
  • Collaboration with environmental consultants for compliance strategies
Risks and watchouts
  • Potential delays in obtaining permits
  • Changes in local regulations regarding solar energy
  • Budget constraints affecting materials and installation
Smart questions to ask
  • What is the expected timeline for permitting and approvals?
  • Are there specific regulations or standards we must adhere to?
  • What is the budget allocated for this project?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed specifications of the solar system requirements
  • Exact funding available for the installation
  • Information on previous solar installations at the school or town
  • Local zoning restrictions or environmental assessments
  • Any pre-bid meetings or site visits planned by the agency
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-24-1240-TOA01-TOA01-128944
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.