Jabish Brook Trestle Bridge Rehabilitation
Federal opportunity from ACCTPAY - Accounts Payable • Town of Belchertown. Place of performance: MA. Response deadline: May 15, 2026. Industry: Source industry codes 30, 19, 00.
- Source
- Open on official portal →
- Solicitation
- BD-24-1654-ACCTP-ACCTP-128132
- Performance
- Belchertown, MA 01007
- Response
- May 15, 2026, 10:00 AM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 22 more rate previews.↓
Description
rehabilitation of the existing 61â?? long, 5 span timber former railroad trestle for continued use as a pedestrian and snowmobile bridge. Scope includes the demolition and replacement of the timber deck and curbs, minor timber substructure repairs, and the installation of a chain link fence as a bridge rail.
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Jabish Brook Trestle Bridge Rehabilitation project involves the rehabilitation of a 61-foot long, 5-span timber bridge, specifically designed for pedestrian and snowmobile use. Major tasks include demolishing and replacing the timber deck and curbs, along with executing minor repairs on the timber substructure and installing a chain link fence. Bids are due by May 15, 2026, providing ample time for interested contractors to prepare their proposals.
The buyer aims to rehabilitate a vital bridge infrastructure to ensure its usability for pedestrians and snowmobilers, enhancing safety and functionality.
- Contractors with experience in bridge rehabilitation
- Firms experienced in timber construction
- Companies specializing in pedestrian bridge projects
- Demolition and replacement of the timber deck
- Demolition and replacement of timber curbs
- Minor repairs to the timber substructure
- Installation of a chain link fence as bridge rail
- Company overview and relevant experience
- Detailed project approach and methodology
- Cost proposal with itemized costs
- Timeline for completion
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Adhering to local and federal safety regulations
- Meeting environmental compliance standards for construction
- Consider cost of materials for timber and chain link fence
- Estimate labor costs accurately based on expected project duration
- Teaming up with local subcontractors skilled in timber work
- Potential partnerships with environmental compliance consultants
- Potential delays due to weather conditions affecting timber work
- Unforeseen structural issues upon demolition that could increase costs
- What is the budget range for this project?
- Are there specific environmental regulations we need to be aware of?
- What is the anticipated timeline for project approvals?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Exact location of the bridge
- Details on local permitting requirements
- Clarification on available materials
- Any specific design preferences
- Potential environmental assessments required
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.