Skip to content
Town of Belmont

2026 Pavement Management Project

Solicitation: BD-25-1245-PUBLI-PBLWO-125592
Notice ID: ma_commbuys_d61042548a59e7c0a562
Source codes30, 12, 17DepartmentTown of BelmontAgencyPublicwks - PublicwksStateMAPostedFeb 18, 2026, 04:30 PM UTCDueMar 19, 2026, 10:00 AM UTCExpiredBid range$432,739 - $512,876
Contract snapshot

Federal opportunity from PUBLICWKS - PUBLICWKS • Town of Belmont. Place of performance: MA. Response deadline: Mar 19, 2026. Industry: Source industry codes 30, 12, 17.

Source
Open on official portal →
Solicitation
BD-25-1245-PUBLI-PBLWO-125592
Performance
Moore Street Belmont, MA 02478
Response
Mar 19, 2026, 10:00 AM UTC
Open on official portal →
Map for MA
Live POP
Place of performance
Moore Street Belmont, MA 02478
State: MA
Contracting office
Matt Haskell 19 Moore Street Belmont, MA 02478 US

Point of Contact

Name
Matthew Haskell
Email
Not available
Phone
Not available

Agency & Office

Department
Town of Belmont
Agency
PUBLICWKS - PUBLICWKS
Subagency
PUBLICWKS - PUBLICWKS
Office
PBLWO - Public Works
Contracting Office Address
Matt Haskell 19 Moore Street Belmont, MA 02478 US

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260006 (Rev 2)
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
7 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 5 more rate previews.
Davis-BaconBest fitstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD
Davis-Baconstate match
MA20260025 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Worcester
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
inges POWER EQUIPMENT OPERATORS: CRANE A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY
Base $46.38Fringe $31.04
Rate
POWER EQUIPMENT OPERATORS: (4) ROLLER A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY
Base $39.12Fringe $31.04
+8 more occupation rates in this WD
Davis-Baconstate match
MA20260001 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Bristol, Dukes +5
Rate
TOR/ASBESTOS WORKER (ZONE B) ZONE B- BARNSTABLE COUNTY (BARNSTABLE, BOURNE, FALMOUTH, MASHPEE, SANDWICH), BRISTOL COUNTY (ALL CITIES EXCEPT EASTON),AND NORFOLK COUNTY (BELLINGHAM, FRANKLIN, PLAINVILLE)
Base $55.45Fringe $36.63
Rate
OOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBOROUGH, HOLBROOK, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHAM, NORFOLK, NORWOOD, QUINCY, RANDOLPH, SHARON, STOUGHTON, WALPOLE, WELLESLEY, WESTWOOD, WEYMOUTH)
Base $55.45Fringe $36.63
Rate
URO, WELLFLEET AND YARMOUTH); BRISTOL (EASTON); ESSEX; MIDDLESEX; NORFOLK (AVON, BRAINTREE, BROOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBORO, HOLBROOK, HULL, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHA
Base $55.45Fringe $36.63
+87 more occupation rates in this WD

Description

2026 Pavement Management Project Project Description: Work includes roadway reconstruction, paving, curb & sidewalk work and other appurtenant and related items at various locations in the Town of Belmont.

Advisory bid range

Pricing and bid posture

medium confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,524,600,184
Sector total $3,524,600,184 • Share 100.0%
Live
Median
$350,000
P10–P90
$31,970$3,446,688
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,524,600,184)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 21, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The 2026 Pavement Management Project, issued by PUBLICWKS, involves roadway reconstruction, paving, and curb & sidewalk work across various locations in Belmont. This project is set to close on March 19, 2026, at 10:00 AM, providing ample time for bidders to prepare competitive proposals. Interested bidders should access the detailed specification document linked in the attachments to understand project specifics.

pavement managementroadway reconstructionsidewalk installationmunicipal infrastructureBelmont Public Workssource codes 30, 12, 17
What the buyer is trying to do

PUBLICWKS aims to enhance the infrastructure of Belmont through comprehensive pavement management activities, which include reconstruction and paving improvements.

Who should pursue this
  • Contractors with experience in roadway reconstruction
  • Firms specializing in municipal infrastructure projects
  • Companies with capabilities in paving and sidewalk work
Work breakdown
  • Roadway reconstruction
  • Paving
  • Curb and sidewalk installation
  • Related appurtenant work
  • Site-specific assessments for each location
Response package checklist
  • Completed response form
  • Relevant experience documentation
  • Proposed pricing structure
  • Project timeline and work schedule
  • List of subcontractors (if any)
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Adherence to local construction codes is mandatory.
  • Bidders should be aware of environmental regulations related to paving work.
Pricing strategy
  • Consider competitive pricing to align with municipal budgeting constraints.
  • Incorporate potential cost-saving measures to improve value propositions.
Teaming and subs
  • Consider partnering with local subcontractors for excavation and groundwork.
  • Engage specialists for curb and sidewalk installation to enhance bid competitiveness.
Risks and watchouts
  • Unexpected site conditions may increase costs.
  • Weather delays impacting the construction timeline.
  • Regulatory changes affecting project compliance.
Smart questions to ask
  • What specific locations will be prioritized for the work?
  • Are there any existing conditions or requirements we should be aware of?
  • What is the projected budget for the project?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Details on funding source for the project
  • Specific locations of the work within Belmont
  • Potential environmental assessments required
  • Projected budget or funding limits
  • Any mandatory pre-bid meetings or site visits
  • List of previous contractors for reference
  • Local union requirements if applicable
  • Timeline for project completion beyond the response deadline
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-25-1245-PUBLI-PBLWO-125592
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.