Skip to content
Town of Clarksburg

Middle Road Resurfacing, Drainage Improvements and Related Work Project

Solicitation: BD-26-1745-ADM11-TH111-129264
Notice ID: ma_commbuys_02b1d79a3fd46613cb66
DepartmentTown of ClarksburgStateMAPostedDueJun 15, 2026, 04:00 PM UTCCloses in 20 daysBid range$316,256 - $374,822
Contract snapshot

Federal opportunity from Town of Clarksburg. Place of performance: MA. Response deadline: Jun 15, 2026.

Source
Open on official portal →
Solicitation
BD-26-1745-ADM11-TH111-129264
Performance
MA
Response
Jun 15, 2026, 04:00 PM UTC
Open on official portal →
Live POP
Place of performance
MA
Contracting office
Not listed

Point of Contact

Name
Ron Boucher
Email
Not available
Phone
Not available

Agency & Office

Department
Town of Clarksburg
Agency
Not available
Subagency
Not available
Office
Ron Boucher
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260018 (Rev 1)
Published May 18, 2026Massachusetts • Essex
24 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 22 more rate previews.
Davis-BaconBest fitstate match
MA20260018 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Essex
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Plymouth
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; POST DRIVER (GUARDRAIL/FENCES)
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD

Description

Middle Road Resurfacing, Drainage Improvements and Related Work Project

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,474,911
Sector total $3,515,474,911 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,474,911)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: May 17, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Town of Clarksburg is soliciting bids for the Middle Road Resurfacing and Drainage Improvements project, with the post date listed as May 13, 2026. Bids must be submitted by June 15, 2026, and contractors must be approved by Mass DOT to participate. The project includes resurfacing and drainage enhancements, critical for local infrastructure improvements.

Middle Road ResurfacingDrainage ImprovementsMass DOT ApprovalPublic Works Contract
What the buyer is trying to do

The buyer aims to select a qualified contractor to carry out resurfacing, drainage improvements, and related work on Middle Road, enhancing road safety and community infrastructure.

Who should pursue this
  • Contractors approved by Mass DOT
  • General contractors with experience in road work
  • Companies specializing in drainage improvements
Work breakdown
  • Resurfacing of Middle Road
  • Improvements to drainage systems
  • Related civil engineering work
Response package checklist
  • Completing the bid form
  • Proof of Mass DOT approval
  • Detailed project plan and timeline
  • Cost estimate and pricing proposal
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Must adhere to Mass DOT regulations
  • Contractors must meet safety standards
  • Compliance with local bid submission requirements
Pricing strategy
  • Cost estimates should reflect local market rates
  • Consider incorporating contingency costs for unforeseen issues
  • Competitive pricing based on previous similar projects
Teaming and subs
  • Consider teaming with local subcontractors for efficient execution
  • Identify specialists for drainage systems if needed
  • Engage suppliers for materials to lower costs
Risks and watchouts
  • Potential for project delays due to weather
  • Risk of cost overruns if not estimated properly
  • Need for compliance with state and local regulations
Smart questions to ask
  • What specific approvals are required from Mass DOT?
  • Are there any known challenges in the area that could affect the project?
  • What is the expected timeline for contractor selection and project commencement?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No details on the estimated budget for the project
  • No specific timelines for start and completion of the work
  • Information on local regulations affecting project execution
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-26-1745-ADM11-TH111-129264
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.