Middle Road Resurfacing, Drainage Improvements and Related Work Project
Federal opportunity from Town of Clarksburg. Place of performance: MA. Response deadline: Jun 15, 2026.
- Source
- Open on official portal →
- Solicitation
- BD-26-1745-ADM11-TH111-129264
- Performance
- MA
- Response
- Jun 15, 2026, 04:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 22 more rate previews.↓
Description
Middle Road Resurfacing, Drainage Improvements and Related Work Project
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Town of Clarksburg is soliciting bids for the Middle Road Resurfacing and Drainage Improvements project, with the post date listed as May 13, 2026. Bids must be submitted by June 15, 2026, and contractors must be approved by Mass DOT to participate. The project includes resurfacing and drainage enhancements, critical for local infrastructure improvements.
The buyer aims to select a qualified contractor to carry out resurfacing, drainage improvements, and related work on Middle Road, enhancing road safety and community infrastructure.
- Contractors approved by Mass DOT
- General contractors with experience in road work
- Companies specializing in drainage improvements
- Resurfacing of Middle Road
- Improvements to drainage systems
- Related civil engineering work
- Completing the bid form
- Proof of Mass DOT approval
- Detailed project plan and timeline
- Cost estimate and pricing proposal
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Must adhere to Mass DOT regulations
- Contractors must meet safety standards
- Compliance with local bid submission requirements
- Cost estimates should reflect local market rates
- Consider incorporating contingency costs for unforeseen issues
- Competitive pricing based on previous similar projects
- Consider teaming with local subcontractors for efficient execution
- Identify specialists for drainage systems if needed
- Engage suppliers for materials to lower costs
- Potential for project delays due to weather
- Risk of cost overruns if not estimated properly
- Need for compliance with state and local regulations
- What specific approvals are required from Mass DOT?
- Are there any known challenges in the area that could affect the project?
- What is the expected timeline for contractor selection and project commencement?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No details on the estimated budget for the project
- No specific timelines for start and completion of the work
- Information on local regulations affecting project execution
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.