Jackson & Public Wks Sewer Lift Station In-Kind Replacement of Pump & Controls
Federal opportunity from Town of Franklin. Place of performance: MA. Response deadline: May 21, 2026.
- Source
- Open on official portal →
- Solicitation
- BD-26-1271-CPO00-CPO-127937
- Performance
- MA
- Response
- May 21, 2026, 10:00 AM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 22 more rate previews.↓
Description
Jackson & Public Wks Sewer Lift Station In-Kind Replacement of Pump & Controls
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Town of Franklin seeks contractors for the Jackson & Public Works Sewer Lift Stations Pump & Controls In-Kind Replacement Project. This notice is posted under MGL c. 30 section 39m, highlighting the legal framework for this procurement. The response deadline is May 21, 2026, providing a substantial window for interested companies to prepare proposals.
The Town of Franklin aims to retain a contractor for the in-kind replacement of pumps and controls at Jackson & Public Works Sewer Lift Stations, ensuring efficient sewage management.
- Companies specializing in municipal water treatment infrastructure
- Firms with experience in sewer lift station upgrades
- Contractors with a proven track record in pump and control systems
- Assessment of existing sewer lift stations
- Design specifications for pump and control replacement
- Procurement of pumps and controls
- Installation of new equipment
- Testing and commissioning of the replacement systems
- Training for local staff on the new systems
- Business license and insurance documentation
- Experience and past performance references
- Detailed project approach and timeline
- Cost proposal including all components of the work
- Evidence of compliance with MGL c. 30 section 39m
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Must comply with MGL c. 30 section 39m requirements for public contracts
- Adherence to local and state regulations governing public works
- Consider competitive pricing based on local market rates for similar public contracts
- Include breakdown of costs for transparency
- Potential partnerships with local subcontractors familiar with the area
- Collaboration with firms that specialize in pump manufacturing for technical support
- Risk of delays in procurement if compliance issues arise
- Unforeseen complications with existing infrastructure during replacement
- Potential community impact during construction activities
- What are the specific performance specifications for the pumps and controls?
- Are there any existing features of the lift stations that need to be preserved?
- What are the anticipated timelines for each phase of the project?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed specifications for pumps and controls
- Budget range for the project
- Information on existing conditions at lift stations
- Details on any required permits or inspections
- Clarification on ongoing maintenance requirements post-replacement
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.