Skip to content
Town of Hull

Secondary Clarifiers, Grit & Building Upgrades

Solicitation: BD-26-1284-WWTF-WWTF-127654
Notice ID: ma_commbuys_b88584ffffbe9e372aad
DepartmentTown of HullStateMAPostedDueMay 06, 2027, 11:00 AM UTCCloses in 345 daysBid range$316,256 - $374,822
Contract snapshot

Federal opportunity from Town of Hull. Place of performance: MA. Response deadline: May 06, 2027.

Source
Open on official portal →
Solicitation
BD-26-1284-WWTF-WWTF-127654
Performance
MA
Response
May 06, 2027, 11:00 AM UTC
Open on official portal →
Live POP
Place of performance
MA
Contracting office
Not listed

Point of Contact

Name
Catherine Joaquim
Email
Not available
Phone
Not available

Agency & Office

Department
Town of Hull
Agency
Not available
Subagency
Not available
Office
Catherine Joaquim
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260018 (Rev 1)
Published May 18, 2026Massachusetts • Essex
24 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 22 more rate previews.
Davis-BaconBest fitstate match
MA20260018 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Essex
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Plymouth
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; POST DRIVER (GUARDRAIL/FENCES)
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD

Description

Secondary Clarifiers, Grit & Building Upgrades

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Apr 09, 2026
Client-ready brief
Executive summary
medium confidencelocal fallback

WWTF - Waste Water Treatment Facility issued solicitation Secondary Clarifiers, Grit & Building Upgrades, with . Secondary Clarifiers, Grit, and Building Upgrades (CWSRF #19112) for replacement of secondary clarifier mechanisms and associate pumps, piping, and valves; structural and architectural repairs and improvements to buildings. Additional Work is included for bidding as alternates (awarded at Owner's Option): Alt A: Scum Pump Replacement; Alt B: Influent Wet Well H2S Coating; Alt C: Ext.Building Repairs; Alt D: Grit System Replacement.

Secondary Clarifiers, Grit & Building UpgradesWWTF - Waste Water Treatment Facility
What the buyer is trying to do

Secondary Clarifiers, Grit, and Building Upgrades (CWSRF #19112) for replacement of secondary clarifier mechanisms and associate pumps, piping, and valves; structural and architectural repairs and improvements to buildings. Additional Work is included for bidding as alternates (awarded at Owner's Option): Alt A: Scum Pump Replacement; Alt B: Influent Wet Well H2S Coating; Alt C: Ext.Building Repairs; Alt D: Grit System Replacement. DCAMM certification for GC and sub bidders.

Who should pursue this
  • Solicitation contractors with direct experience delivering comparable work for public buyers.
Work breakdown
  • Secondary Clarifiers, Grit & Building Upgrades
  • Review 1 linked source document.
  • DCAMM certification for GC and sub bidders.
Response package checklist
  • Download and review all official solicitation documents and addenda.
  • Confirm submission format, due date, and delivery method with the buyer portal or notice.
  • Prepare pricing, scope response, and required forms/certifications.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Validate insurance, licensing, and any site-access requirements in the official documents.
Pricing strategy
  • Price to the actual scope and staffing assumptions in the official documents.
  • Watch for multi-site, overtime, after-hours, mobilization, or equipment cost drivers.
  • Confirm whether the buyer expects all-inclusive pricing, line items, or optional services.
Teaming and subs
  • Use subs or teaming partners if specialized staffing, equipment, or local coverage is required.
  • Align subcontract scopes to compliance-sensitive work and document responsibilities clearly.
Risks and watchouts
  • Due date is May 6, 2027; verify exact due time and timezone.
  • Do not assume unstated requirements, contract duration, or evaluation factors.
Smart questions to ask
  • Are there mandatory site visits, staffing minimums, or licensing requirements?
  • What exact documents and forms must be submitted at bid time?
  • Are there incumbent, transition, or performance-reporting requirements not obvious from the summary?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Set-aside status is not confirmed.
  • Contracting office/contact is not clearly identified.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-26-1284-WWTF-WWTF-127654
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.