Skip to content
Town of Lincoln

Pierce House Roof Railing Removal, Restoration and Reinstallation

Solicitation: BD-26-1800-TOL01-TOL01-124745
Notice ID: ma_commbuys_ae3da14cd2652705308f
Source codes72, 15, 23DepartmentTown of LincolnAgencyTOL01 - Town of LincolnStateMAPostedJan 26, 2026, 04:00 PM UTCDueFeb 18, 2026, 09:00 AM UTCExpiredBid range$432,739 - $512,876
Contract snapshot

Federal opportunity from TOL01 - Town of Lincoln • Town of Lincoln. Place of performance: MA. Response deadline: Feb 18, 2026. Industry: Source industry codes 72, 15, 23.

Source
Open on official portal →
Solicitation
BD-26-1800-TOL01-TOL01-124745
Performance
Lincoln Road Town of Lincoln, MA 01773
Response
Feb 18, 2026, 09:00 AM UTC
Open on official portal →
Map for MA
Live POP
Place of performance
Lincoln Road Town of Lincoln, MA 01773
State: MA
Contracting office
Daniel Pereira 16 Lincoln Road Town of Lincoln, MA 01773 US

Point of Contact

Name
Daniel Pereira, Asst. Town Administrator
Email
Not available
Phone
Not available

Agency & Office

Department
Town of Lincoln
Agency
TOL01 - Town of Lincoln
Subagency
TOL01 - Town of Lincoln
Office
TOL01 - Town of Lincoln
Contracting Office Address
Daniel Pereira 16 Lincoln Road Town of Lincoln, MA 01773 US

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260006 (Rev 2)
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
7 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 5 more rate previews.
Davis-BaconBest fitstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD
Davis-Baconstate match
MA20260014 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Dukes, Nantucket
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
s POWER EQUIPMENT OPERATOR: (4) ROLLER A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY
Base $39.12Fringe $31.04
Rate
POWER EQUIPMENT OPERATOR: (1) LOADER A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY
Base $42.88Fringe $31.04
+6 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260001 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Bristol, Dukes +5
Rate
TOR/ASBESTOS WORKER (ZONE B) ZONE B- BARNSTABLE COUNTY (BARNSTABLE, BOURNE, FALMOUTH, MASHPEE, SANDWICH), BRISTOL COUNTY (ALL CITIES EXCEPT EASTON),AND NORFOLK COUNTY (BELLINGHAM, FRANKLIN, PLAINVILLE)
Base $55.45Fringe $36.63
Rate
OOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBOROUGH, HOLBROOK, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHAM, NORFOLK, NORWOOD, QUINCY, RANDOLPH, SHARON, STOUGHTON, WALPOLE, WELLESLEY, WESTWOOD, WEYMOUTH)
Base $55.45Fringe $36.63
Rate
URO, WELLFLEET AND YARMOUTH); BRISTOL (EASTON); ESSEX; MIDDLESEX; NORFOLK (AVON, BRAINTREE, BROOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBORO, HOLBROOK, HULL, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHA
Base $55.45Fringe $36.63
+87 more occupation rates in this WD

Description

The Town of Lincoln Pierce House is soliciting written quotes for removal, restoration and reinstallation of the existing decorative roof balustrade/railing assemblies to facilitate replacement of the roof system (roof replacement by others). The project is located at 17 Weston Road, Lincoln, MA. This work is being procured under M.G.L. c. 149. Prevailing Wage Rates apply.

Advisory bid range

Pricing and bid posture

high confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,267,519
Sector total $3,515,267,519 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,048$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,267,519)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 16, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Town of Lincoln is seeking quotes for the removal, restoration, and reinstallation of the decorative roof balustrade at the Pierce House, located at 17 Weston Road, Lincoln, MA. This project is a crucial step to facilitate the roof system replacement by others, and compliance with prevailing wage rates under M.G.L. c. 149 is required. Bids are due by February 18, 2026, which offers ample time for preparation, although early engagement is advisable.

roof railing removalrestorationprevailing wagehistorical restorationLincoln MAsource codes 72, 15, 23
What the buyer is trying to do

The buyer aims to hire a contractor for the careful removal, restoration, and reinstallation of decorative roof railings to support a roofing replacement project. Compliance with local labor regulations and maintaining the aesthetic integrity of the historical structure are likely priorities.

Who should pursue this
  • Contractors with experience in historical restoration
  • Companies familiar with Massachusetts prevailing wage laws
  • Professionals with roofing project collaboration experience
Work breakdown
  • Assessment of existing railing condition
  • Removal of existing railings
  • Restoration of railings
  • Reinstallation of railings
  • Coordination with roofing contractor
Response package checklist
  • Detailed quote including labor and materials
  • Proof of previous similar project experience
  • Compliance with prevailing wage rates documentation
  • Timeline for project completion
  • Insurance and bonding information
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Must adhere to M.G.L. c. 149 regarding prevailing wage
  • Documentation required to prove compliance with labor standards
Pricing strategy
  • Consider labor intensity due to restoration requirements
  • Include contingencies for unexpected restoration costs
  • Factor in the timing of labor to align with the roofing project
Teaming and subs
  • Partner with a roofing company for seamless project execution
  • Engage subcontractors specializing in historical restorations
Risks and watchouts
  • Potential delays in restoration affecting roofing timeline
  • Compliance issues related to prevailing wage rates
  • Unexpected structural issues during removal
Smart questions to ask
  • Are there any specific restoration techniques preferred?
  • What is the expected timeline for the roof replacement?
  • What budget constraints should be considered?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Solicitation number is not provided
  • No posted date available
  • Period of performance details are missing
  • Specific details on the type of restoration are unspecified
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-26-1800-TOL01-TOL01-124745
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.