Skip to content
Town of Lincoln

LINCOLN MA �¢���� LINCOLN ROAD MAIN WATER REPLACEMENT �¢���� PHASE 2

Solicitation: BD-26-1800-TOLWD-TOLWD-125180
Notice ID: ma_commbuys_ae04d91c21ef4e968999
Source codes83, 10, 15DepartmentTown of LincolnAgencyTOLWD - Town of Lincoln Water DepartmentStateMAPostedFeb 11, 2026, 11:00 AM UTCDueMar 05, 2026, 10:00 AM UTCExpiredBid range$432,739 - $512,876
Contract snapshot

Federal opportunity from TOLWD - Town of Lincoln Water Department • Town of Lincoln. Place of performance: MA. Response deadline: Mar 05, 2026. Industry: Source industry codes 83, 10, 15.

Source
Open on official portal →
Solicitation
BD-26-1800-TOLWD-TOLWD-125180
Performance
Lincoln Road Town of Lincoln, MA 01773
Response
Mar 05, 2026, 10:00 AM UTC
Open on official portal →
Map for MA
Live POP
Place of performance
Lincoln Road Town of Lincoln, MA 01773
State: MA
Contracting office
Daniel Pereira 16 Lincoln Road Town of Lincoln, MA 01773 US

Point of Contact

Name
MunicipalBids
Email
MunicipalBids@woodardcurran.com
Phone
Not available

Agency & Office

Department
Town of Lincoln
Agency
TOLWD - Town of Lincoln Water Department
Subagency
TOLWD - Town of Lincoln Water Department
Office
TOLWD - Town of Lincoln Water Department
Contracting Office Address
Daniel Pereira 16 Lincoln Road Town of Lincoln, MA 01773 US

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260001 (Rev 1)
Published May 18, 2026Massachusetts • Barnstable, Bristol, Dukes +5
90 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 88 more rate previews.
Davis-BaconBest fitstate match
MA20260001 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Bristol, Dukes +5
Rate
TOR/ASBESTOS WORKER (ZONE B) ZONE B- BARNSTABLE COUNTY (BARNSTABLE, BOURNE, FALMOUTH, MASHPEE, SANDWICH), BRISTOL COUNTY (ALL CITIES EXCEPT EASTON),AND NORFOLK COUNTY (BELLINGHAM, FRANKLIN, PLAINVILLE)
Base $55.45Fringe $36.63
Rate
OOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBOROUGH, HOLBROOK, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHAM, NORFOLK, NORWOOD, QUINCY, RANDOLPH, SHARON, STOUGHTON, WALPOLE, WELLESLEY, WESTWOOD, WEYMOUTH)
Base $55.45Fringe $36.63
Rate
URO, WELLFLEET AND YARMOUTH); BRISTOL (EASTON); ESSEX; MIDDLESEX; NORFOLK (AVON, BRAINTREE, BROOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBORO, HOLBROOK, HULL, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHA
Base $55.45Fringe $36.63
+87 more occupation rates in this WD
Davis-Baconstate match
MA20260014 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Dukes, Nantucket
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
s POWER EQUIPMENT OPERATOR: (4) ROLLER A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY
Base $39.12Fringe $31.04
Rate
POWER EQUIPMENT OPERATOR: (1) LOADER A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY
Base $42.88Fringe $31.04
+6 more occupation rates in this WD
Davis-Baconstate match
MA20260016 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Berkshire
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $39.12Fringe $31.04
+20 more occupation rates in this WD
Davis-Baconstate match
MA20260024 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Suffolk
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+23 more occupation rates in this WD

Description

See Full Legal Notice Attached.

Advisory bid range

Pricing and bid posture

medium confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,267,519
Sector total $3,515,267,519 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,048$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,267,519)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 18, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Town of Lincoln Water Department is soliciting bids for the Lincoln Road Main Water Replacement Phase 2 project. The response deadline is set for March 5, 2026. This project falls under UNSPSC category 83-10-15, indicating a focus on water utilities and related infrastructure work.

Water ReplacementInfrastructureMunicipal BidsPhase 2Lincoln MAsource codes 83, 10, 15
What the buyer is trying to do

The buyer aims to replace the main water line on Lincoln Road to improve water service reliability and infrastructure integrity in the area.

Who should pursue this
  • Contractors experienced in water main replacements
  • Firms with expertise in municipal water infrastructure projects
  • Bidders with a proven track record in similar state or local projects
Work breakdown
  • Review attached legal notice for detailed scope of work
  • Prepare technical proposal addressing water replacement specifics
  • Include compliance documentation with local regulations
  • Outline project timeline in relation to performance period
Response package checklist
  • Technical proposal
  • Cost estimate and pricing strategy
  • Evidence of previous similar project experience
  • Compliance documents as required in the legal notice
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure adherence to local environmental regulations
  • Review city permit requirements
Pricing strategy
  • Consider including allowances for potential unforeseen conditions during work execution
  • Reflect competitive pricing while covering project costs appropriately
Teaming and subs
  • Engage local subcontractors familiar with Lincoln's regulations
  • Identify suppliers for water materials and infrastructure needs
Risks and watchouts
  • Potential delays due to weather impacting construction schedule
  • Local community concerns regarding road access during construction
Smart questions to ask
  • What specific challenges have been encountered in Phase 1 of the project?
  • Are there specific local regulations or standards we should be particularly aware of?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Full legal notice details are required for comprehensive understanding of scope
  • Compliance specifics from the legal notice are not detailed
  • Expected project duration and milestones are not stated
  • No pricing guidelines are mentioned in the current brief
  • Attachment URL lacks a direct description of contents
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-26-1800-TOLWD-TOLWD-125180
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.