Skip to content
Town of Lunenburg

Bridge Replacement NO. L-17-003 (C9X) Flat Hill Road Over Catacoonamug Brook

Solicitation: BD-25-1692-LTM00-LTM01-127739
Notice ID: ma_commbuys_b74d3e7e6bab19eeac6b
Source codes72, 14, 00DepartmentTown of LunenburgAgencyLTM001 - Town ManagerStateMAPostedApr 08, 2026, 10:00 AM UTCDueMay 14, 2026, 12:00 PM UTCExpiredBid range$432,739 - $512,876
Contract snapshot

Federal opportunity from LTM001 - Town Manager • Town of Lunenburg. Place of performance: MA. Response deadline: May 14, 2026. Industry: Source industry codes 72, 14, 00.

Source
Open on official portal →
Solicitation
BD-25-1692-LTM00-LTM01-127739
Performance
Main Street Lunenburg, MA 01462
Response
May 14, 2026, 12:00 PM UTC
Open on official portal →
Map for MA
Live POP
Place of performance
Main Street Lunenburg, MA 01462
State: MA
Contracting office
Town of Lunenburg Town of Lunenburg 17 Main Street Lunenburg, MA 01462 US

Point of Contact

Name
Julie Belliveau
Email
Not available
Phone
Not available

Agency & Office

Department
Town of Lunenburg
Agency
LTM001 - Town Manager
Subagency
LTM001 - Town Manager
Office
LTM01 - Town Hall
Contracting Office Address
Town of Lunenburg Town of Lunenburg 17 Main Street Lunenburg, MA 01462 US

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260018 (Rev 1)
Published May 18, 2026Massachusetts • Essex
24 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 22 more rate previews.
Davis-BaconBest fitstate match
MA20260018 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Essex
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Plymouth
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; POST DRIVER (GUARDRAIL/FENCES)
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD

Description

Bridge Replacement of Bridge No. L-17-003 Email jbelliveau@lunenburgma.gov for a copy of the IFB

Advisory bid range

Pricing and bid posture

medium confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Apr 15, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Town Manager is soliciting bids for the replacement of Bridge No. L-17-003 on Flat Hill Road over Catacoonamug Brook, with a bid submission deadline of May 14, 2026. Interested bidders can request a copy of the Invitation for Bid (IFB) by emailing jbelliveau@lunenburgma.gov. The project is classified under various NAICS codes, indicating a focus on construction and related activities.

bridge replacementconstruction bidLunenburgCatacoonamug BrookIFBsource codes 72, 14, 00
What the buyer is trying to do

The Town Manager aims to replace an aging bridge to improve infrastructure and ensure safe passage over Catacoonamug Brook.

Who should pursue this
  • Construction firms with experience in bridge projects
  • Subcontractors specializing in civil engineering
  • Local contractors with knowledge of Lunenburg regulations
Work breakdown
  • Replacement of existing bridge
  • Site preparation and clearing
  • Construction of new bridge structure
  • Installation of safety features
  • Final inspection and approval
Response package checklist
  • Request the IFB document
  • Prepare bid proposal
  • Include qualifications and past project references
  • Outline pricing strategy
  • Submit bid before the deadline
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Bidders must adhere to local and state construction regulations
  • All submitted proposals should be compliant with IFB specifications
Pricing strategy
  • Consider local competition when setting prices
  • Include a detailed breakdown of material and labor costs
Teaming and subs
  • Engage local subcontractors for specialized tasks
  • Coordinate with civil engineering firms for technical support
Risks and watchouts
  • Potential delays due to weather conditions
  • Risks related to site access during construction
  • Budget overruns if material costs increase
Smart questions to ask
  • What specific requirements are outlined in the IFB?
  • Are there any environmental assessments required prior to construction?
  • What is the expected timeline for the project post-award?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specific cost estimates provided
  • No detailed project scope or technical specifications available
  • No immediate contacts for follow-up questions
  • No information on funding sources or budget limits
  • No project timeline details except for the bid deadline
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-25-1692-LTM00-LTM01-127739
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.