Skip to content
Town of Medway

IFB - Village St at Holliston St Complete Streets Improvement

Solicitation: BD-26-1429-TABOS-TABOS-125306
Notice ID: ma_commbuys_1b7d1742f120767ed646
Source codes30, 12, 00DepartmentTown of MedwayAgencyTABOS - Town ManagerStateMAPostedFeb 19, 2026, 10:00 AM UTCDueMar 19, 2026, 10:00 AM UTCExpiredBid range$316,256 - $374,822
Contract snapshot

Federal opportunity from TABOS - Town Manager • Town of Medway. Place of performance: MA. Response deadline: Mar 19, 2026. Industry: Source industry codes 30, 12, 00.

Source
Open on official portal →
Solicitation
BD-26-1429-TABOS-TABOS-125306
Performance
Village Street Medway, MA 02053
Response
Mar 19, 2026, 10:00 AM UTC
Open on official portal →
Map for MA
Live POP
Place of performance
Village Street Medway, MA 02053
State: MA
Contracting office
A Potter 155 Village Street Medway, MA 02053 US

Point of Contact

Name
mdube
Email
mdube@theengineeringcorp.com
Phone
Not available

Agency & Office

Department
Town of Medway
Agency
TABOS - Town Manager
Subagency
TABOS - Town Manager
Office
TABOS - Town Administrator
Contracting Office Address
A Potter 155 Village Street Medway, MA 02053 US

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260018 (Rev 1)
Published May 18, 2026Massachusetts • Essex
24 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 22 more rate previews.
Davis-BaconBest fitstate match
MA20260018 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Essex
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Plymouth
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; POST DRIVER (GUARDRAIL/FENCES)
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD

Description

IFB for complete street improvements at Village St at Holliston St. Bid doc available at https://medwayma.gov/purchasing/ or DPW Office, 45B Holliston St, Door 9, Medway during business hours. Select Board awards the contract. Est. value: $782K.

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,474,911
Sector total $3,515,474,911 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,474,911)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 26, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Town of Medway is seeking bids for the IFB concerning complete street improvements at Village St at Holliston St. The estimated value of the project is $782,000, with bids due by March 19, 2026. Bid documents can be obtained from the Town's website or the DPW Office. This project is an opportunity for firms specializing in street improvements to engage in a significant municipal contract in the region.

Complete StreetsInfrastructure ImprovementMunicipal ContractRoadway ConstructionBid Proposalsource codes 30, 12, 00
What the buyer is trying to do

The Town Manager's office aims to improve the streetscape and infrastructure at the intersection of Village St and Holliston St to enhance transportation safety and accessibility.

Who should pursue this
  • Construction firms with experience in complete street improvement projects.
  • Civil engineering firms that focus on municipal contracts.
  • Subcontractors specializing in paving, landscaping, and traffic management.
Work breakdown
  • Obtain bid documents from the provided sources.
  • Prepare and submit bid proposal.
  • Address any questions or clarifications regarding the project.
  • Implement the complete street improvements as per specifications.
  • Coordinate with the Select Board for contract award.
Response package checklist
  • Completed bid proposal form.
  • Proof of experience and previous projects.
  • Financial bid and cost breakdown.
  • Timeline for project completion.
  • Any required licenses and certifications.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure adherence to local construction codes and regulations.
  • Verify compliance with any state funding requirements.
Pricing strategy
  • Bid competitively while considering costs associated with materials and labor.
  • Take into account local economic factors that may affect pricing.
Teaming and subs
  • Potential teaming with local subcontractors to enhance community relations.
  • Collaboration with civil engineering firms for design compliance.
Risks and watchouts
  • Potential delays in permitting and approvals that could impact project timeline.
  • Scope changes that might arise during the construction phase.
Smart questions to ask
  • What specific improvements are prioritized at the intersection?
  • Are there any unique local compliance requirements to be aware of?
  • What is the timeline for project selection and award?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific technical requirements for the complete street improvements are not detailed.
  • Details about community engagement or public feedback isn't provided.
  • Information on existing conditions at the site is absent.
  • No mention of required bonding or insurance levels for bidders.
  • Lack of specifics on potential funding sources or grants for the project.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-26-1429-TABOS-TABOS-125306
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.