Advanced Meter AMI and water meter project
Federal opportunity from TON01 - Town of Nahant • Town of Nahant. Place of performance: MA. Response deadline: Mar 17, 2026. Industry: Source industry codes 47, 10, 00.
- Source
- Open on official portal →
- Solicitation
- BD-26-1547-TON01-TON01-125457
- Performance
- Nahant Road Town of Nahant, MA 01908
- Response
- Mar 17, 2026, 11:00 AM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 88 more rate previews.↓
Description
Advvanced Meter AMI and water Meter Project
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Town of Nahant is seeking qualified bidders for their Advanced Meter AMI and water meter project, with a response deadline set for March 17, 2026. This project is categorized under UNSPSC 47-10-00, which focuses on telecommunications and related services. Interested bidders should prepare to showcase their capabilities in advanced metering infrastructure to meet the Town's needs.
The buyer aims to implement an advanced metering infrastructure (AMI) and water meter system to improve monitoring and management of water usage.
- Companies specializing in AMI technology
- Water utility management firms
- Manufacturers of water metering solutions
- Develop advanced metering infrastructure
- Install water meters
- Integration with existing systems
- Training and support for town staff
- Cover letter
- Technical proposal
- Pricing proposal
- Qualifications and experience
- Project timeline
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Adhere to local municipal regulations
- Meet UNSPSC 47-10-00 standards
- Consider competitive pricing in relation to AMI solutions
- Explore long-term maintenance plans as add-ons
- Potential partnerships with local contractors
- Collaboration with technology vendors
- Subcontracting data analytics services
- Potential delays in project implementation due to unforeseen circumstances
- Risk of cost overruns
- Changing regulations affecting project scope
- What is the anticipated timeline for the project implementation?
- Are there specific technological requirements or preferences for the AMI system?
- What are the expected challenges the Town has faced with previous installations?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific performance period dates
- Detailed scope of work
- Budget range for the project
- Number of meters to be installed
- Existing infrastructure details
- Potential environmental considerations
- Expected maintenance terms
- Past experiences with similar implementations
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.