Seekonk - On-Call Pavement and Rehabilitation Services
Federal opportunity from FINANCE - Finance Department • Town of Seekonk. Place of performance: MA. Response deadline: May 14, 2026. Industry: Source industry codes 72, 14, 10.
- Source
- Open on official portal →
- Solicitation
- BD-26-1458-FINAN-TH-128391
- Performance
- Peck Street Seekonk, MA 02771
- Response
- May 14, 2026, 02:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 22 more rate previews.↓
Description
Pavement milling and overlay with pavement reconstruction as necessary of Arcade Avenue and Oak Hill Avenue, a distance of approximately 3 miles. Work includes new asphalt sidewalks and berms. MassDOT prequalification of contractors with the Class of Work as Pavement Surfacing for the project over a two-year period.
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The City of Seekonk is soliciting bids for on-call pavement and rehabilitation services, particularly focused on Arcade Avenue and Oak Hill Avenue over a distance of approximately 3 miles. The work includes pavement milling, overlay, and necessary reconstruction, complemented by the installation of new asphalt sidewalks and berms. Bidders must be MassDOT prequalified contractors in the Class of Work as Pavement Surfacing, with the project timeframe extending over two years.
The Finance Department is aiming to select a contractor for pavement rehabilitation services to enhance road conditions and infrastructure on specified streets in Seekonk.
- MassDOT prequalified contractors
- Contractors with experience in pavement surfacing
- Companies offering road rehabilitation services
- Pavement milling and overlay
- Pavement reconstruction as necessary
- Installation of new asphalt sidewalks
- Installation of berms
- Completed bid proposal
- Proof of MassDOT prequalification
- Timeline for project completion
- Warranty information for services provided
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Must comply with MassDOT regulations
- Adhere to local government requirements
- Follow safety and environmental standards
- Competitive pricing expected due to multiple bidders
- Consider unit pricing for materials and labor
- Be mindful of cost control over two-year performance period
- Potential partnerships with local subcontractors
- Consider teaming with suppliers for materials
- Look for specialized asphalt companies for expertise
- Failure to meet MassDOT prequalification requirements
- Delays in project timeline due to weather or unforeseen circumstances
- Cost overruns from material price volatility
- What is the estimated total budget for the project?
- Are there any specific timelines for project phases?
- What are the payment terms and conditions for completed work?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No specific solicitation number provided
- No detailed posting date available
- Unclear if there are mandatory pre-bid meetings
- Lack of details about existing road conditions
- No information on funding sources for the project
Service match
Optional support routes matched to this notice after the core solicitation details.
Other matched support routes↓
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.