26C-470-1786
Federal opportunity from Town of Wellesley. Place of performance: MA. Response deadline: Jun 11, 2026.
- Source
- Open on official portal →
- Solicitation
- BD-26-1344-00400-00460-130027
- Performance
- MA
- Response
- Jun 11, 2026, 02:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 9 more rate previews.↓
Description
26C-470-1786
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The opportunity involves the installation of approximately 900 linear feet of 6" water main on Easton Court, along with the replacement of around 2,700 linear feet of 6" water main on Edgemoor Avenue. This is critical work for the Public Works agency as it addresses aging infrastructure and enhances water service reliability. The bid response is due by June 11, 2026, allowing a limited timeframe for preparation and submission.
The buyer aims to replace outdated water mains to improve the public water system's reliability and efficiency in the specified areas.
- Contractors experienced in water main installation
- Firms familiar with municipal infrastructure projects
- Companies with a background in replacing CI pipes
- Install 900 linear feet of 6" water main on Easton Court
- Replace 550 linear feet of 6" CI pipe off Washington Street
- Replace 200 linear feet of 2" CI off Maugus Avenue
- Replace 2,700 linear feet of 6" water main on Edgemoor Avenue
- Bid proposal
- Credentials and experience documentation
- Safety and compliance records
- Cost estimate breakdown
- Project timeline proposal
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Adherence to state and local construction codes is mandatory
- All work must meet environmental regulations concerning water infrastructure
- Consider fixed pricing to manage costs effectively
- Evaluate potential for cost overruns based on materials and labor hours needed
- Collaborate with local suppliers for materials to reduce lead times
- Engage subcontractors with specialized experience in water main systems
- Potential delays due to unforeseen underground conditions
- Regulatory changes affecting project scope or requirements
- Weather impacts on construction schedules
- What are the deadlines for each phase of the installation?
- Are there specific materials preferred by the agency?
- What safety protocols need to be in place during the installation?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Details on specific compliance requirements
- Requirements for contractor bonding or insurance
- Information on local labor laws
- Clarification on soil conditions or testing needed
- Any permitted work hours and noise regulations
- State-specific environmental assessments required
- Historical issues with existing water mains in the area
- Access information for construction zones
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.