Skip to content
Department of Natural Resources

Heartland State Trail - Phase II

Solicitation: Not available
Notice ID: mn_osp__10209352
Contract snapshot

Federal opportunity from Minnesota Department of Natural Resources • Department of Natural Resources. Place of performance: MN. Response deadline: Jun 04, 2026.

Source
Open on official portal →
Solicitation
mn_osp__10209352
Performance
Near Park Rapids, MN • US
Response
Jun 04, 2026, 02:00 PM UTC
Open on official portal →
Map for MN
Live POP
Place of performance
Near Park Rapids, MN • US
State: MN
Contracting office
Not listed

Point of Contact

Name
Not available
Email
Not available
Phone
218-308-2639
Name
Jeff Erickson, P.E.
Email
Jeff.erickson@state.mn.us
Phone
320-634-7365
Name
Sue Crapser
Email
sue.crapser@state.mn.us
Phone
Not available

Agency & Office

Department
Department of Natural Resources
Agency
Minnesota Department of Natural Resources
Subagency
Minnesota Department of Natural Resources
Office
218-308-2639; Jeff Erickson, P.E. <Jeff.erickson@state.mn.us> 320-634-7365; Sue Crapser <sue.crapser@state.mn.us>
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MN20260013 (Rev 1)
Published May 18, 2026Minnesota • Lake of the Woods
27 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 25 more rate previews.
Davis-BaconBest fitstate match
MN20260013 (Rev 1)
Open WD
Published May 18, 2026Minnesota • Lake of the Woods
Rate
TRUCK DRIVER
Base $10.40Fringe $0.00
Rate
POWER EQUIPMENT OPERATOR GROUP 9
Base $14.14Fringe $2.90
Rate
POWER EQUIPMENT OPERATOR GROUP 8
Base $14.70Fringe $2.90
+24 more occupation rates in this WD
Davis-Baconstate match
MN20260047 (Rev 1)
Open WD
Published May 18, 2026Minnesota • Douglas
Rate
WIRING SYSTEMS INSTALLER
Base $31.25Fringe $15.83
Rate
WIRING SYSTEM TECHNICIAN
Base $44.61Fringe $20.17
Rate
UNDERGROUND AND OPEN DITCH LABORER (EIGHT FEET BELOW STARTING GRADE LEVEL)
Base $36.00Fringe $24.26
+52 more occupation rates in this WD
Davis-Baconstate match
MN20260007 (Rev 1)
Open WD
Published May 18, 2026Minnesota • Chippewa, Kandiyohi, Lac Qui Parle +3
Rate
SHEET METAL WORKER (EXCEPT THE EASTERN PART OF MEEKER COUNTY)
Base $11.94Fringe $2.48
Rate
ROOFER
Base $10.00Fringe $0.00
Rate
POWER EQUIPMENT OPERATOR (FRONT END LOADER)
Base $8.00Fringe $0.00
+11 more occupation rates in this WD
Davis-Baconstate match
MN20260111 (Rev 1)
Open WD
Published May 18, 2026Minnesota • Winona
Rate
WIRING SYSTEMS INSTALLER
Base $33.44Fringe $17.82
Rate
WIRING SYSTEM TECHNICIAN
Base $47.73Fringe $22.24
Rate
UNDERGROUND AND OPEN DITCH LABORER (EIGHT FEET BELOW STARTING GRADE LEVEL)
Base $32.01Fringe $21.84
+54 more occupation rates in this WD

Description

State Project No. 2026-853-8T373 This project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference and has a 3% (TG/ED/VO) subcontracting goal established. SUMMARY OF WORK: The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. 16,200 CY of Common Excavation 2. 600 CY of Granular Borrow 3. 17,275 SY. of Grading and Compacting Subgrade 4. 12,340 SY. of 2.5” Thick Bituminous Paving 5. 4,800 SY. of Erosion Control Blanket 6. 7,185 LF. of Preassembled Silt Fence 7. 174 LF. of Corrugated Aluminum Steel Pipes 8. 9.1 Acres of Clearing and Grubbing 9. 6.7 Turf Establishment C. DESCRIPTION OF ALTERNATES Alternate 1: Construct additional .12 Miles (650 LF) of additional Trail with concrete vehicle crossing slab. D. DESCRIPTION OF UNIT PRICES The Bid must be based upon the estimated quantities listed in the bid worksheet within the VirtuBid area of the Quest CDN plan room for this project. Responders must provide a unit price for each item described in the bid worksheet within the VirtuBid area of the QuestCDN plan room for this project. See subsection 1.14(C) Considerations of Responses of Section 00 21 23 Instructions to Responders for additional detail on how unit prices will be utilized under a Contract. If a responder discovers an error or needs additional clarification regarding the unit prices described in bid worksheet described above, submit a question by the end of the question-and-answer period stated in Section 00 11 14 Solicitation Advertisement Information. See subsection 1.03(B) Examination of Site and Documents of Section 00 21 23 Instructions to Responders for additional detail. Plans and Specifications were prepared by the Minnesota Department of Natural Resources, Contact: Jeff Erickson, P.E. All responses to this solicitation must be submitted and received in the Quest CDN Plan Room no later than 2:00pm on June 04, 2026. Bids will only be received and accepted via the online electronic bid service through QuestCDN.com.

Advisory bid range

Pricing and bid posture

high confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,516,281,615
Sector total $3,516,281,615 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,459$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,516,281,615)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.