Minnesota Department of Administration

Shower Building and Day Use Area Improvements, Banning State Park

Solicitation: Not available
Notice ID: mn_osp__10181044
DepartmentMinnesota Department of AdministrationStateMNPostedApr 27, 2026, 12:00 AM UTCDueMay 27, 2026, 02:00 PM UTCCloses in 1 daysBid range$625,611 - $741,464
Contract snapshot

Federal opportunity from Minnesota Department of Administration • Minnesota Department of Administration. Place of performance: MN. Response deadline: May 27, 2026.

Source
Open on official portal →
Solicitation
mn_osp__10181044
Performance
Sandstone, MN • US
Response
May 27, 2026, 02:00 PM UTC
Open on official portal →
Map for MN
Live POP
Place of performance
Sandstone, MN • US
State: MN
Contracting office
Not listed

Point of Contact

Name
Not available
Email
Not available
Phone
651-201-2451
Name
Staci Stoerzinger
Email
staci.stoerzinger@state.mn.us
Phone
Not available

Agency & Office

Department
Minnesota Department of Administration
Agency
Minnesota Department of Administration
Subagency
Minnesota Department of Administration
Office
651-201-2451; Staci Stoerzinger <staci.stoerzinger@state.mn.us>
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MN20260013 (Rev 1)
Published May 18, 2026Minnesota • Lake of the Woods
27 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 25 more rate previews.
Davis-BaconBest fitstate match
MN20260013 (Rev 1)
Open WD
Published May 18, 2026Minnesota • Lake of the Woods
Rate
TRUCK DRIVER
Base $10.40Fringe $0.00
Rate
POWER EQUIPMENT OPERATOR GROUP 9
Base $14.14Fringe $2.90
Rate
POWER EQUIPMENT OPERATOR GROUP 8
Base $14.70Fringe $2.90
+24 more occupation rates in this WD
Davis-Baconstate match
MN20260047 (Rev 1)
Open WD
Published May 18, 2026Minnesota • Douglas
Rate
WIRING SYSTEMS INSTALLER
Base $31.25Fringe $15.83
Rate
WIRING SYSTEM TECHNICIAN
Base $44.61Fringe $20.17
Rate
UNDERGROUND AND OPEN DITCH LABORER (EIGHT FEET BELOW STARTING GRADE LEVEL)
Base $36.00Fringe $24.26
+52 more occupation rates in this WD
Davis-Baconstate match
MN20260007 (Rev 1)
Open WD
Published May 18, 2026Minnesota • Chippewa, Kandiyohi, Lac Qui Parle +3
Rate
SHEET METAL WORKER (EXCEPT THE EASTERN PART OF MEEKER COUNTY)
Base $11.94Fringe $2.48
Rate
ROOFER
Base $10.00Fringe $0.00
Rate
POWER EQUIPMENT OPERATOR (FRONT END LOADER)
Base $8.00Fringe $0.00
+11 more occupation rates in this WD
Davis-Baconstate match
MN20260111 (Rev 1)
Open WD
Published May 18, 2026Minnesota • Winona
Rate
WIRING SYSTEMS INSTALLER
Base $33.44Fringe $17.82
Rate
WIRING SYSTEM TECHNICIAN
Base $47.73Fringe $22.24
Rate
UNDERGROUND AND OPEN DITCH LABORER (EIGHT FEET BELOW STARTING GRADE LEVEL)
Base $32.01Fringe $21.84
+54 more occupation rates in this WD

Description

State Project Number 2026-876-8P517 Shower Building and Day Use Area Improvements Banning State Park A. The work will be done under one prime contract that includes: General, Mechanical, Demolition, Excavation, Civil, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. New construction of a seasonal campground shower/restroom building (approximately 1,600 SF). This will include removal of existing shower/restroom building, slab and foundation system, and existing septic tanks/mounds; modification to existing utilities; and installation of a new gravel parking lot (7 standard and accessible stalls), two new water hydrants (bottle filler/spigot) and associated piping. Site work includes demolition, excavation, erosion control, concrete pavement, water distribution system, mechanical and electrical systems, site preparation, and landscaping. 2. Additional site improvements at the Campground and Day Use Areas (Site 1 and Site 2) include: a. Campground: upgrades to 6 campsite spurs to meet accessibility requirements. b. Day Use Areas (Site 1 and Site 2): At “Day Use Area - Site 2,” demolish existing picnic area restroom building, slab and foundation system, and septic, expand and improve existing parking lot (202 standard and accessible stalls), expand and improve picnic area and trailheads for accessibility and landscape screening, install new vault toilet, and install two new water hydrants (bottle filler/spigot) and associated piping. At “Day Use Area - Site 1,” establish new gravel parking lot along existing park road (12 standard and accessible stalls) and connect new parking lot to existing trail. c. Site work includes demolition, grubbing, excavation, erosion control, water distribution system, site preparation, and landscaping. Plans and Specifications were prepared Minnesota Department of Natural Resources Design and Construction, Amy Artates Carroll, 500 Lafayette Road, St. Paul, MN 55155, 651-259-5486, amy.carroll@state.mn.us. All responses to this solicitation must be submitted and received in the QuestCDN Plan Room no later than the due date and time. Bids will only be received and accepted via the online electronic bid service through QuestCDN.com.

Advisory bid range

Pricing and bid posture

high confidence
$625,611 - $741,464

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$625,611
Target
$662,022
Premium
$741,464
Labor
$329,680
Direct
$32,000
Burden
$221,360
Fee + reserve
$78,022
Target $662,022Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,516,281,615
Sector total $3,516,281,615 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,459$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,516,281,615)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.