Shower Building and Day Use Area Improvements, Banning State Park
Federal opportunity from Minnesota Department of Administration • Minnesota Department of Administration. Place of performance: MN. Response deadline: May 27, 2026.
- Source
- Open on official portal →
- Solicitation
- mn_osp__10181044
- Performance
- Sandstone, MN • US
- Response
- May 27, 2026, 02:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 25 more rate previews.↓
Description
State Project Number 2026-876-8P517 Shower Building and Day Use Area Improvements Banning State Park A. The work will be done under one prime contract that includes: General, Mechanical, Demolition, Excavation, Civil, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. New construction of a seasonal campground shower/restroom building (approximately 1,600 SF). This will include removal of existing shower/restroom building, slab and foundation system, and existing septic tanks/mounds; modification to existing utilities; and installation of a new gravel parking lot (7 standard and accessible stalls), two new water hydrants (bottle filler/spigot) and associated piping. Site work includes demolition, excavation, erosion control, concrete pavement, water distribution system, mechanical and electrical systems, site preparation, and landscaping. 2. Additional site improvements at the Campground and Day Use Areas (Site 1 and Site 2) include: a. Campground: upgrades to 6 campsite spurs to meet accessibility requirements. b. Day Use Areas (Site 1 and Site 2): At “Day Use Area - Site 2,” demolish existing picnic area restroom building, slab and foundation system, and septic, expand and improve existing parking lot (202 standard and accessible stalls), expand and improve picnic area and trailheads for accessibility and landscape screening, install new vault toilet, and install two new water hydrants (bottle filler/spigot) and associated piping. At “Day Use Area - Site 1,” establish new gravel parking lot along existing park road (12 standard and accessible stalls) and connect new parking lot to existing trail. c. Site work includes demolition, grubbing, excavation, erosion control, water distribution system, site preparation, and landscaping. Plans and Specifications were prepared Minnesota Department of Natural Resources Design and Construction, Amy Artates Carroll, 500 Lafayette Road, St. Paul, MN 55155, 651-259-5486, amy.carroll@state.mn.us. All responses to this solicitation must be submitted and received in the QuestCDN Plan Room no later than the due date and time. Bids will only be received and accepted via the online electronic bid service through QuestCDN.com.
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.