Camp Pond Dam Reconstruction Project
Federal opportunity from CITY OF RALEIGH. Place of performance: NC. Response deadline: Jul 10, 2026.
- Source
- Open on official portal →
- Solicitation
- ncevp_d54776024f517fb3fbe504b8bf965bbaff38dfb8
- Performance
- NC
- Response
- Jul 10, 2026, 02:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 19 more rate previews.↓
Description
This project involves the reconstruction of the Camp Pond Dam located approximately at 5016 Richland Drive Raleigh, NC 27612 in response to Notices of Deficiency issued by North Carolina Department of Environmental Quality Dam Safety (Dam Safety). Camp Pond Dam is categorized as a small, high hazard potential earthen dam by Dam Safety (State ID number WAKE-198), and is privately co-owned by four residents. The City of Raleigh (City) is in the process of purchasing permanent easements to take full ownership and operation responsibility of the dam. The City maintains the public right-of-way for Richland Drive that crosses the dam. Richland Drive is the only access to the Lakeland Woods neighborhood south of Camp Pond Dam, and access must be maintained at all times. The dam has a structural height of approximately 23 feet, a surface area of approximately 4 acres, and a maximum impoundment capacity of 13 acre-feet per the NC Inventory of Dams Data Sheet.
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.