DSS Chiller, Cooling Tower, and Boiler Replacement
Federal opportunity from CITY OF WINSTON-SALEM. Place of performance: NC. Response deadline: Jul 07, 2026.
- Source
- Open on official portal →
- Solicitation
- ncevp_723c9161e6f7b864c8bcc729a5f5d7be0d53fcfb
- Performance
- NC
- Response
- Jul 07, 2026, 02:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 29 more rate previews.↓
Description
This project is at the Forsyth County DSS Power Plant. It includes the replacement of six 2MBH with two 3MBH boilers, the replacement of the cooling tower serving the Carrier chiller, and the replacement of the Carrier chiller. These systems have reached the end of their useful life and require replacement.
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.