Skip to content
Orange Water & Sewer Authority

Gravity Sewer Rehabilitation Program (GSR) Program, Group 1 Package

Solicitation: Not available
Notice ID: ncevp_af42a49a5c0757ae9dee6cad7b8652a511b75763
DepartmentOrange Water & Sewer AuthorityStateNCPostedApr 13, 2026, 12:00 AM UTCDueMay 21, 2026, 03:00 PM UTCExpiredBid range$432,739 - $512,876
Contract snapshot

Federal opportunity from ORANGE WATER & SEWER AUTHORITY. Place of performance: NC. Response deadline: May 21, 2026.

Source
Open on official portal →
Solicitation
ncevp_af42a49a5c0757ae9dee6cad7b8652a511b75763
Performance
NC
Response
May 21, 2026, 03:00 PM UTC
Open on official portal →
Live POP
Place of performance
NC
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
ORANGE WATER & SEWER AUTHORITY
Agency
Not available
Subagency
Not available
Office
David Moore
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
NC20260011 (Rev 1)
Published May 18, 2026North Carolina • Wake
20 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 18 more rate previews.
Davis-BaconBest fitstate match
NC20260011 (Rev 1)
Open WD
Published May 18, 2026North Carolina • Wake
Rate
ELECTRICIAN
Base $31.07Fringe $13.36
Rate
IRONWORKER
Base $29.75Fringe $18.00
Rate
PIPEFITTER
Base $33.96Fringe $13.48
+17 more occupation rates in this WD
Davis-Baconstate match
NC20260123 (Rev 1)
Open WD
Published May 18, 2026North Carolina • Currituck, Gates
Rate
IRONWORKER
Base $29.75Fringe $18.00
Rate
PIPEFITTER
Base $33.96Fringe $13.48
Rate
TRUCK DRIVER: DUMP TRUCK
Base $15.98Fringe $2.93
+17 more occupation rates in this WD
Davis-Baconstate match
NC20260052 (Rev 1)
Open WD
Published May 18, 2026North Carolina • Cherokee
Rate
PIPEFITTER (EXCLUDING HVAC SYSTEM INSTALLATION)
Base $31.66Fringe $12.69
Rate
TRUCK DRIVER: DUMP TRUCK
Base $12.50Fringe $1.36
Rate
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION
Base $13.61Fringe $1.10
+18 more occupation rates in this WD
Davis-Baconstate match
NC20260002 (Rev 1)
Open WD
Published May 18, 2026North Carolina • Catawba
Rate
IRONWORKER
Base $29.75Fringe $18.00
Rate
PIPEFITTER
Base $33.96Fringe $13.48
Rate
PLUMBER
Base $33.96Fringe $13.48
+18 more occupation rates in this WD

Description

CIP No.: 376-01 Project: Gravity Sewer Rehabilitation (GSR) Program, Group 1 Package Owner: ORANGE WATER AND SEWER AUTHORITY (OWASA) 400 JONES FERRY ROAD CARRBORO, NORTH CAROLINA 27510 Date: April 10, 2026 Pursuant to Section 143-129 of the General Statutes of North Carolina, sealed Bids will be received by Orange Water and Sewer Authority from Bidders until 3:00 P.M., local time, on May 21, 2026 for CIP No.: 376-01, Project: “Gravity Sewer Rehabilitation (GSR) Program, Group 1 Package” in the Administrative Offices, 400 Jones Ferry Road, Carrboro, North Carolina 27510, at which time the Bids received will be opened and read aloud. Bids will be received for a Unit Price General Construction Contract. The Contractor and all Subcontractors shall have valid North Carolina General Contractor’s Licenses for the type and value of the work to be performed. The Project base bid consists of furnishing all materials, labor, equipment, tools, etc. unless otherwise specified, for the rehabilitation of approximately 1.5 miles of gravity sewer pipe, ranging in size from 8-inch to 12-inch diameter, through a combination of approaches including but not limited to open cut point repairs, cured-in-place pipe lining, and pipe bursting. Work also includes lateral reinstatements, bypass pumping if needed, manhole rehabilitation identified as needed based on field conditions, traffic control if needed, restoring ground and roadway surfaces, and all associated appurtenances as described in the Specifications and as shown on the Drawings. The Project add alternate bid consists of furnishing all materials, labor, equipment, tools, etc. unless otherwise specified for the complete and operable rehabilitation of 8-inch gravity sewer through cured-in-place pipe patches, associated lateral reinstatements, and all associated appurtenances as described in the Specifications and as shown on the Drawings. The foregoing description shall not be construed as a complete description of all work required. Beginning on April 10, 2026, the Contract Documents will be available electronically. Electronic copies will be transmitted to prospective bidders by request through email, free of charge, by emailing Stephanie Holloman at stephanie.holloman@hdrinc.com. Bidders are strongly encouraged to attend a non-mandatory Pre-Bid Conference at 3:00 P.M., local time, on April 29, 2026 in the OWASA Administration Offices, 400 Jones Ferry Road, Carrboro, North Carolina. Attendance will be limited to two representatives from each firm. Orange Water and Sewer Authority has adopted a minimum ten (10%) percent goal for participation by minority businesses in the total value of the work for this project in accordance with Section 143-128.2 of the General Statutes of North Carolina.

Advisory bid range

Pricing and bid posture

high confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,516,281,615
Sector total $3,516,281,615 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,459$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,516,281,615)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.