Skip to content
Western Piedmont Community College

WPCC Dental Classroom Renovation

Solicitation: Not available
Notice ID: ncevp_195bf82af2e526a0a08d4449e2319cd172025428
DepartmentWestern Piedmont Community CollegeStateNCPostedMay 27, 2026, 12:00 AM UTCDueJun 18, 2026, 09:00 AM UTCCloses in 22 daysBid range$432,739 - $512,876
Contract snapshot

Federal opportunity from WESTERN PIEDMONT COMMUNITY COLLEGE. Place of performance: NC. Response deadline: Jun 18, 2026.

Source
Open on official portal →
Solicitation
ncevp_195bf82af2e526a0a08d4449e2319cd172025428
Performance
NC
Response
Jun 18, 2026, 09:00 AM UTC
Open on official portal →
Live POP
Place of performance
NC
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
WESTERN PIEDMONT COMMUNITY COLLEGE
Agency
Not available
Subagency
Not available
Office
Robin Hall
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
NC20260108 (Rev 1)
Published May 18, 2026North Carolina • Rowan
30 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 28 more rate previews.
Davis-BaconBest fitstate match
NC20260108 (Rev 1)
Open WD
Published May 18, 2026North Carolina • Rowan
Rate
TRUCK DRIVER: SEMI-TRAILER TRUCK
Base $14.77Fringe $0.00
Rate
TRUCK DRIVER: DUMP TRUCK
Base $14.90Fringe $0.00
Rate
SPRINKLER FITTER (FIRE SPRINKLERS)
Base $13.71Fringe $0.00
+27 more occupation rates in this WD
Davis-Baconstate match
NC20260054 (Rev 1)
Open WD
Published May 18, 2026North Carolina • Jackson
Rate
PIPEFITTER (EXCLUDING HVAC SYSTEM INSTALLATION)
Base $31.66Fringe $12.69
Rate
TRUCK DRIVER: DUMP TRUCK
Base $12.50Fringe $1.36
Rate
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION
Base $13.61Fringe $1.10
+18 more occupation rates in this WD
Davis-Baconstate match
NC20260052 (Rev 1)
Open WD
Published May 18, 2026North Carolina • Cherokee
Rate
PIPEFITTER (EXCLUDING HVAC SYSTEM INSTALLATION)
Base $31.66Fringe $12.69
Rate
TRUCK DRIVER: DUMP TRUCK
Base $12.50Fringe $1.36
Rate
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION
Base $13.61Fringe $1.10
+18 more occupation rates in this WD
Davis-Baconstate match
NC20260011 (Rev 1)
Open WD
Published May 18, 2026North Carolina • Wake
Rate
ELECTRICIAN
Base $31.07Fringe $13.36
Rate
IRONWORKER
Base $29.75Fringe $18.00
Rate
PIPEFITTER
Base $33.96Fringe $13.48
+17 more occupation rates in this WD

Description

WPCC intends to convert an existing general classroom in the Foothills Higher Education Center, located at 2128 S. Sterling St. Morganton, NC 28655, into a dental laboratory/classroom for instructional purposes. The new clinic will be similar in character and function to the existing dental clinic in the building and will be used for educational purposes with multiple operatories and support spaces. The new dental equipment has been purchased by the college and is onsite. The contractor will coordinate with the dental equipment company, architect, and WPCC on technical requirements of dental chairs, utilities, and support. PDF copies of the bid documents may be obtained by contacting Nverse Architects PLLC at darren@nversearchitects.com or 919-475-0296. A Pre-Bid meeting is Mandatory for this project.

Advisory bid range

Pricing and bid posture

high confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,513,923,140
Sector total $3,513,923,140 • Share 100.0%
Live
Median
$350,000
P10–P90
$31,970$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,513,923,140)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.