UNR - Install New Boilers at Lake Tahoe Prim Library
Federal opportunity from BCN Purchasing. Place of performance: NV. Response deadline: May 14, 2026.
- Source
- Open on official portal →
- Solicitation
- nv_ionwave__itb-9099-addendum-1
- Performance
- 1664 North Virginia Street Reno, NV 89557-0242 USA
- Response
- May 14, 2026, 02:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 15 more rate previews.↓
Description
BCN Purchasing does not accept physical documents in response to any solicitation including but not limited to: ITB, RFP, RFQ, or CMAR solicitations. All documents must be submitted electronically via this website. The NGEM system allows for bidders to start and save work/uploads without submitting. Please make use of this capability to begin building your bid early and reduce the chances of internet connectivity or upload issues causing a last-minute inability to submit. Once the ITB/RFP/RFQ/CMAR closes and the responses are unsealed electronically, the list of bidders/responders will be posted online shortly thereafter and available to the public for viewing. This document can be accessed by clicking on Closed Bid Opportunities, selecting the specific opportunity, and scrolling down to Bid Documents. The Bid Tabulation document will be available for review there. Description of Work: This is a prevailing wage project. Replace the two existing 1.5 MBH boilers. UNR Project#: # 24MNC02720 Labor Commissioner #: WA-2026-342 SPWD Project #: N/A Estimated Cost Range: $50,000 to $150,000 Liquidated Damages: $200 per day Required Insurance if Awarded: Commercial General Liability, Business Automobile Liability, and Workers' Compensation will be required. An Installation Floater will be required if the award amount is less than $100,000. Builders Risk Insurance will be required if the award amount equals or exceeds $100,000. Please refer to the TEMPLATE-Owner-Contractor Construction Agreement on the Attachments tab for limits and additional information and in compliance with the requirements set forth here: https://www.unr.edu/bcn-nshe/risk/contracts. Completion of Work: Subject to change by Owner, Work is scheduled to begin on "May 28, 2026" and shall be fully complete by "August 28, 2026."
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.