Skip to content
City of Salem

#256124 2026 Crack Seal

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-KS0043-00016627
Contract snapshot

Federal opportunity from KS004302 - Engineering | KS004 - Engineering • City of Salem. Place of performance: OR. Response deadline: May 19, 2026.

Source
Open on official portal →
Solicitation
state_or_oregonbuys__S-KS0043-00016627
Performance
OR
Response
May 19, 2026, 02:30 PM UTC
Open on official portal →
Live POP
Place of performance
OR
Contracting office
Not listed

Point of Contact

Name
Rose Henlin
Email
Not available
Phone
Not available

Agency & Office

Department
City of Salem
Agency
KS004302 - Engineering | KS004 - Engineering
Subagency
KS004302 - Engineering | KS004 - Engineering
Office
Rose Henlin
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
OR20260084 (Rev 1)
Published May 18, 2026Oregon • Curry
14 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 12 more rate previews.
Davis-BaconBest fitstate match
OR20260084 (Rev 1)
Open WD
Published May 18, 2026Oregon • Curry
Rate
HEAT & FROST INSULATOR
Base $62.02Fringe $22.36
Rate
BRICKLAYER
Base $49.60Fringe $25.15
Rate
CARPENTER
Base $52.62Fringe $16.81
+11 more occupation rates in this WD
Davis-Baconstate match
OR20260081 (Rev 1)
Open WD
Published May 18, 2026Oregon • Baker, Benton, Clackamas +33
Rate
ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECT
Base $57.82Fringe $16.70
Rate
ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECT
Base $54.82Fringe $16.70
Rate
ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECT
Base $51.82Fringe $16.70
+9 more occupation rates in this WD
Davis-Baconstate match
OR20260068 (Rev 1)
Open WD
Published May 18, 2026Oregon • Hood River
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (PIPE INSULATION ONLY)
Base $62.02Fringe $22.36
Rate
MILLWRIGHT
Base $59.35Fringe $22.38
Rate
CARPENTER (EXCLUDING FORM WORK)
Base $53.94Fringe $16.81
+30 more occupation rates in this WD
Davis-Baconstate match
OR20260019 (Rev 1)
Open WD
Published May 18, 2026Oregon • Washington
Rate
BRICKLAYER
Base $49.60Fringe $25.15
Rate
TILE SETTER
Base $43.93Fringe $21.81
Rate
TILE FINISHER
Base $32.68Fringe $16.48
+27 more occupation rates in this WD

Description

#256124 2026 Crack Seal Engineer's Estimate $120,000 to $155,000 2026 Crack Seal

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Apr 15, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The opportunity titled '#256124 2026 Crack Seal' is issued by the Engineering office of KS004302, with an estimated budget ranging from $120,000 to $155,000. Proposals are due by May 19, 2026, at 14:30 UTC, offering ample preparation time for bidders. This project focuses specifically on crack sealing, indicating a specialized need for engineering expertise in road maintenance and repair.

Crack sealRoadway maintenanceEngineering servicesPavingState contracts
What the buyer is trying to do

The buyer aims to secure services for crack sealing as part of their road maintenance initiatives, utilizing a firm with engineering capabilities to ensure effective project execution within the budget outlined.

Who should pursue this
  • Engineering firms with experience in roadway maintenance
  • Contractors specializing in paving and sealing
  • Small businesses with relevant capabilities and subcontracting potential
Work breakdown
  • Project planning and scheduling
  • Materials procurement and management
  • Crack sealing application
  • Quality assurance and compliance checks
  • Final inspection and reporting
Response package checklist
  • Completed bid form
  • Documentation of relevant experience
  • Safety and compliance certifications
  • Cost proposal within the estimated budget
  • References from similar projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Adherence to state engineering standards is required
  • Bidders must be compliant with local regulations regarding paving operations
Pricing strategy
  • Pricing should fall within the estimated range of $120,000 to $155,000
  • Consider direct costs of materials and labor when forming the bid
Teaming and subs
  • Partnering with local subcontractors who provide sealing materials or specialized labor may strengthen the bid
  • Consider teaming with firms that have local experience and established relationships with the agency
Risks and watchouts
  • Potential delays in project initiation due to weather conditions
  • Changes in material costs affecting overall budget
  • Compliance risk if engineering standards are not met
Smart questions to ask
  • What specific engineering standards must be adhered to for this project?
  • Are there any existing conditions or site challenges that bidders should be aware of?
  • What is the selection criteria for evaluating proposals?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specific start/end dates for the performance period are provided
  • Lack of detailed scope about the areas to be crack sealed
  • No information on previous contracts or performance expectations
  • Absence of a solicitation number
  • No buyer contact information available
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.