Skip to content
Port of Newport

RFQ: NOAA MOC-P Maintenance Dredging 2026

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-R21689-00016678
Contract snapshot

Federal opportunity from R2168902 - Administration | R2168 - Administration • Port of Newport. Place of performance: OR. Response deadline: Jul 14, 2026.

Source
Open on official portal →
Solicitation
state_or_oregonbuys__S-R21689-00016678
Performance
OR
Response
Jul 14, 2026, 05:00 PM UTC
Open on official portal →
Live POP
Place of performance
OR
Contracting office
Not listed

Point of Contact

Name
Jim Durkee
Email
Not available
Phone
Not available

Agency & Office

Department
Port of Newport
Agency
R2168902 - Administration | R2168 - Administration
Subagency
R2168902 - Administration | R2168 - Administration
Office
Jim Durkee | Jim Durkee, 541-270-0545, Email: jim@portofnewport.com
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
OR20260084 (Rev 1)
Published May 18, 2026Oregon • Curry
14 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 12 more rate previews.
Davis-BaconBest fitstate match
OR20260084 (Rev 1)
Open WD
Published May 18, 2026Oregon • Curry
Rate
HEAT & FROST INSULATOR
Base $62.02Fringe $22.36
Rate
BRICKLAYER
Base $49.60Fringe $25.15
Rate
CARPENTER
Base $52.62Fringe $16.81
+11 more occupation rates in this WD
Davis-Baconstate match
OR20260081 (Rev 1)
Open WD
Published May 18, 2026Oregon • Baker, Benton, Clackamas +33
Rate
ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECT
Base $57.82Fringe $16.70
Rate
ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECT
Base $54.82Fringe $16.70
Rate
ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECT
Base $51.82Fringe $16.70
+9 more occupation rates in this WD
Davis-Baconstate match
OR20260068 (Rev 1)
Open WD
Published May 18, 2026Oregon • Hood River
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (PIPE INSULATION ONLY)
Base $62.02Fringe $22.36
Rate
MILLWRIGHT
Base $59.35Fringe $22.38
Rate
CARPENTER (EXCLUDING FORM WORK)
Base $53.94Fringe $16.81
+30 more occupation rates in this WD
Davis-Baconstate match
OR20260019 (Rev 1)
Open WD
Published May 18, 2026Oregon • Washington
Rate
BRICKLAYER
Base $49.60Fringe $25.15
Rate
TILE SETTER
Base $43.93Fringe $21.81
Rate
TILE FINISHER
Base $32.68Fringe $16.48
+27 more occupation rates in this WD

Description

RFQ: NOAA MOC-P Maintenance Dredging 2026 The Port of Newport is requesting competitive quotations for hydraulic dredging at the NOAA Marine Operations Center Pacific Facility. The scope of work includes maintenance dredging maximum of 18,000 cubic yards to the design depths provided. TERMS AND CONDITIONS 1. Schedule for Work - Start Permit issuance and In-water - 11/01/2026 and In water Completion- 2/1/2027 Time is of the essence. All attempts at improving the schedule will be made by the contractor; permit renewal application is in process, timeline pends permit approval. if the Port does not have approved permits in hand by 1600 January 4, 2027 work on the project will shift to 01 November 2027. Upland disposal site preparation may begin as soon as the contract is awarded and can be completed at any point prior to commencement of in-water work. 2. General Description - The Port of Newport is requesting competitive quotations for hydraulic dredging at the NOAA Marine Operations Center - Pacific Facility. The scope of work includes maintenance dredging maximum of 18,000 cubic yards to the design depths provided. The dredging will encompass the north side of the facility wharf from 50 feet west of the wharf including berths 1 through berth 3. The approximate area is 50 feet wide x 800 feet long. Maximum estimated yardage to be removed is 18,000 yds of loose sandy/silt material. The contractor shall provide a per cubic yard quote for dredging to design depths and costs associated with delivering and offloading dredge spoils to the upland disposal area. This RFQ includes the preparation and maintenance of the upland dredge disposal site. 3. Scope of Work - Provide all labor, material, tools, lift equipment, supervision min one company employed, full time foreman, submittals, manuals and incidentals necessary to complete all work implied by the attached scope of work you are quoting. Any deviations taken by bidder to the terms, conditions, plans, specifications, codes, etc of this RFQ shall be clearly stated and included as an attachment to the Bid Form. 4. Bid Breakdown: Please use attached Bid Form. Your proposal cannot be considered unless the Bid Form has been completed in its entirety. Lump sum bids shall be inclusive of all taxes, freight, insurance, overhead, permits, fees, and profit.

Advisory bid range

Pricing and bid posture

high confidence
$625,611 - $741,464

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$625,611
Target
$662,022
Premium
$741,464
Labor
$329,680
Direct
$32,000
Burden
$221,360
Fee + reserve
$78,022
Target $662,022Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.