Skip to content
Tennessee Department of General Services

CDBG-Disaster Recovery Housing Rehabilitation Reconstruction Program Implementation Services

Solicitation: Not available
Notice ID: tn_cpo__RFI 33004-11526
Contract snapshot

Federal opportunity from Central Procurement Office • Tennessee Department of General Services. Place of performance: TN.

Source
Open on official portal →
Solicitation
tn_cpo__RFI 33004-11526
Performance
TN
Response
No due date posted
Open on official portal →
Live POP
Place of performance
TN
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Tennessee Department of General Services
Agency
Central Procurement Office
Subagency
Central Procurement Office
Office
Kent.Archer@tn.gov
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
TN20260025 (Rev 1)
Published May 18, 2026Tennessee • Cannon, Cheatham, Dickson +7
9 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 7 more rate previews.
Davis-BaconBest fitstate match
TN20260025 (Rev 1)
Open WD
Published May 18, 2026Tennessee • Cannon, Cheatham, Dickson +7
Rate
ROOFER, INCLUDES SHAKE & SHINGLE ROOFS
Base $10.25Fringe $0.00
Rate
PLUMBER
Base $17.50Fringe $0.00
Rate
OPERATOR: BACKHOE
Base $13.17Fringe $0.00
+6 more occupation rates in this WD
Davis-Baconstate match
TN20260172 (Rev 1)
Open WD
Published May 18, 2026Tennessee • Perry, Wayne
Rate
POWER EQUIPMENT OPERATOR: CRANE
Base $36.25Fringe $13.40
Rate
POWER EQUIPMENT OPERATOR: BULLDOZER
Base $33.23Fringe $13.40
Rate
POWER EQUIPMENT OPERATOR (BACKHOE/TRACKHOE/EXCAVATOR)
Base $33.23Fringe $13.40
+9 more occupation rates in this WD
Davis-Baconstate match
TN20260133 (Rev 1)
Open WD
Published May 18, 2026Tennessee • Polk
Rate
ELECTRICIAN
Base $35.35Fringe $14.63
Rate
OPERATING ENGINEERS: (FORKLIFT)
Base $30.44Fringe $13.40
Rate
OPERATING ENGINEERS: (BULLDOZER AND CRANE)
Base $33.23Fringe $13.40
+6 more occupation rates in this WD
Davis-Baconstate match
TN20260008 (Rev 1)
Open WD
Published May 18, 2026Tennessee • Bledsoe, Grundy, Meigs +3
Rate
ROOFER: SHAKE & SHINGLE ROOF
Base $11.41Fringe $0.00
Rate
PLUMBER
Base $12.66Fringe $0.00
Rate
PAINTER: BRUSH, ROLLER AND SPRAY
Base $10.34Fringe $0.00
+7 more occupation rates in this WD

Description

CDBG-Disaster Recovery Housing Rehabilitation Reconstruction Program Implementation Services

Advisory bid range

Pricing and bid posture

high confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 03, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The State of Tennessee is seeking responses for the implementation of the CDBG-Disaster Recovery Housing Rehabilitation and Reconstruction Program through RFI #33004-11526, issued on 2/23/2026. With a substantial allocation of $34,451,100.00 to address housing needs following disasters DR-4751 and DR-4832, TNECD aims to restore compliant housing for low- and moderate-income families in most impacted areas. This RFI is a preliminary step to identify qualified housing entities to serve as subrecipients for program delivery.

CDBG-DRHousing RehabilitationDisaster RecoveryImportant AreasLow-Moderate Income Housing
What the buyer is trying to do

The buyer, Tennessee Department of Economic and Community Development (TNECD), is looking to identify qualified housing entities with experience in disaster recovery to manage the CDBG-DR Housing Rehabilitation and Reconstruction Program effectively.

Who should pursue this
  • Organizations with experience in disaster recovery housing programs
  • Entities specializing in low- and moderate-income housing rehabilitation
  • Contractors experienced in construction management for federally funded projects
Work breakdown
  • Identify interested housing entities
  • Assess program delivery approaches
  • Gather responses to inform future solicitations
Response package checklist
  • Completed Organization Informational Form
  • Cost Information Form detailing pricing units
  • Description of relevant housing experience
  • Staffing and implementation capacity description
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Must comply with federal and state procurement requirements
  • Follow TNECD program guidelines for implementation
  • Responses are confidential and only released post-evaluation
Pricing strategy
  • Outline typical pricing units (per hour, per job, etc.)
  • Provide a competitive pricing range for similar services
Teaming and subs
  • Consider partnerships with local contractors for effective service delivery
  • Engage consultants with expertise in disaster recovery programs
  • Collaborate with community organizations to enhance outreach efforts to eligible families
Risks and watchouts
  • Potential delays in program implementation due to compliance challenges
  • Limited capacity to manage large volumes of applications
  • Risk of underestimating the scale of rehabilitation needs in disaster-affected areas
Smart questions to ask
  • What are the specific eligibility criteria for subrecipients?
  • How will the selection process for subrecipients be conducted?
  • What reporting requirements are expected of subrecipients during program implementation?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific dates for the anticipated contract award
  • Detailed scoring criteria for evaluating RFI responses
  • Any mandatory qualifications that respondents must meet
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.