Skip to content
Bountiful

2026 Street Reconstruction Projects

Solicitation: Not available
Notice ID: ut-u3p-223847
DepartmentBountifulAgencyCitiesStateUTPostedDueMar 17, 2026, 08:00 PM UTCExpiredBid range$432,739 - $512,876
Contract snapshot

Federal opportunity from CITIES • Bountiful. Place of performance: UT. Response deadline: Mar 17, 2026.

Source
Open on official portal →
Solicitation
ut-u3p-223847
Performance
Utah
Response
Mar 17, 2026, 08:00 PM UTC
Open on official portal →
Live POP
Place of performance
Utah
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Bountiful
Agency
CITIES
Subagency
CITIES
Office
Not available
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
UT20260100 (Rev 1)
Published May 18, 2026Utah • Summit
29 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 27 more rate previews.
Davis-BaconBest fitstate match
UT20260100 (Rev 1)
Open WD
Published May 18, 2026Utah • Summit
Rate
TRUCK DRIVER: WATER TRUCK
Base $22.44Fringe $11.51
Rate
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK
Base $27.34Fringe $8.55
Rate
TRUCK DRIVER: DUMP TRUCK
Base $22.32Fringe $9.09
+26 more occupation rates in this WD
Davis-Baconstate match
UT20260111 (Rev 1)
Open WD
Published May 18, 2026Utah • Weber
Rate
TRUCK DRIVER: WATER TRUCK
Base $25.25Fringe $11.47
Rate
TRUCK DRIVER: VACTOR
Base $23.40Fringe $0.00
Rate
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK
Base $27.78Fringe $11.64
+31 more occupation rates in this WD
Davis-Baconstate match
UT20260076 (Rev 1)
Open WD
Published May 18, 2026Utah • Sanpete
Rate
BOILERMAKER
Base $44.37Fringe $26.87
Rate
ELECTRICIAN
Base $41.23Fringe $17.66
Rate
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)
Base $31.86Fringe $15.83
+14 more occupation rates in this WD
Davis-Baconstate match
UT20260020 (Rev 1)
Open WD
Published May 18, 2026Utah • Millard
Rate
OPERATOR: POWER EQUIPMENT (3) BACKHOE/EXCAVATOR
Base $30.78Fringe $16.09
Rate
OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY
Base $22.03Fringe $11.88
Rate
OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY
Base $35.68Fringe $17.57
+18 more occupation rates in this WD

Description

2026 Street Reconstruction Projects

Advisory bid range

Pricing and bid posture

medium confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,522,398,754
Sector total $3,522,398,754 • Share 100.0%
Live
Median
$350,000
P10–P90
$31,970$3,446,688
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,522,398,754)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 26, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The 2026 Street Reconstruction Projects, identified under notice ID ut-u3p-223847, have a response deadline set for March 17, 2026. This opportunity involves infrastructure improvements that likely require expertise in street construction and urban planning. Firms with experience in municipal projects are encouraged to consider this bid.

street reconstructionmunicipal infrastructureproject managementcivil engineeringurban development
What the buyer is trying to do

The buyer is seeking contractors to manage and execute street reconstruction efforts throughout various cities, improving public infrastructure and ensuring compliance with local standards.

Who should pursue this
  • Contractors specializing in civil engineering
  • Firms with experience in municipal infrastructure projects
  • Companies with proven track records of handling large-scale construction projects
Work breakdown
  • Project site assessment
  • Design and planning approvals
  • Street demolition and excavation
  • Pavement installation
  • Finishing works such as sidewalks and drainage
Response package checklist
  • Company overview and relevant experience
  • Detailed project approach and methodology
  • Pricing proposal and breakdown
  • Timeline for project phases
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure adherence to municipal regulations
  • Follow local environmental guidelines
  • Comply with labor laws and safety standards
Pricing strategy
  • Competitive pricing based on market analysis
  • Consider fixed-price or cost-reimbursable contracts
  • Include contingencies for unexpected site conditions
Teaming and subs
  • Collaboration with local suppliers for materials
  • Partnership with engineering consultants for project design
  • Engagement with subcontractors for specific trades
Risks and watchouts
  • Potential delays due to weather conditions
  • Unforeseen site conditions affecting costs
  • Public relations issues arising from disruption to local traffic
Smart questions to ask
  • What are the specific locations and scope of work for the street reconstruction?
  • Are there any preferred materials or methodologies mandated by the agency?
  • What are the key performance indicators for project completion?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific locations for the street reconstruction
  • Detailed scope of work
  • Budget range for the project
  • Attachments or additional documentation
  • Pre-bid conference information
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.