NS26-96 Gateway Preparatory Academy - Roof Replacement
Federal opportunity from Division of Purchasing. Place of performance: UT. Response deadline: Mar 07, 2026.
- Source
- Open on official portal →
- Solicitation
- ut-u3p-223025
- Performance
- Utah
- Response
- Mar 07, 2026, 12:00 AM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 27 more rate previews.↓
Description
NS26-96 Gateway Preparatory Academy - Roof Replacement
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
This opportunity (notice_id ut-u3p-223025) is titled “NS26-96 Gateway Preparatory Academy - Roof Replacement” and is issued by the Division of Purchasing. The description provides only the project name and indicates the work is a roof replacement at Gateway Preparatory Academy. The response deadline is 2026-03-07 (UTC). Because the notice lacks scope, specifications, and attachments, bidders should focus on confirming roofing system requirements, site conditions, and bid form/compliance details before committing significant estimating resources.
Procure a contractor to perform a roof replacement project for Gateway Preparatory Academy under project identifier NS26-96, with solicitation managed by the Division of Purchasing.
- Commercial/educational facility roofing contractors with demonstrated roof replacement experience and the ability to meet a 2026-03-07 response deadline.
- General contractors that self-perform roofing or have strong roofing subcontractors, if the solicitation allows primes other than roofing specialty contractors.
- Bid/estimate preparation for a roof replacement at Gateway Preparatory Academy (NS26-96).
- Roof replacement construction work (specific system type, quantities, and details not provided in the notice).
- Project closeout deliverables typical to roof replacement (warranties, as-builts, inspections) are likely but not stated.
- Confirm solicitation number and full bid package source (not provided in the notice).
- Completed bid/proposal form(s) required by the Division of Purchasing (forms not provided).
- Roofing contractor qualifications and comparable project references for roof replacement (if requested in the bid package).
- Schedule/lead time narrative aligned to roof replacement execution (if requested).
- Bonding/insurance documentation if required (not stated; must confirm).
- Acknowledgment of addenda (if any; none provided here).
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Response deadline is 2026-03-07T00:00:00+00:00; confirm local time convention and submission method once the bid package is obtained.
- Key compliance elements (set-aside status, NAICS/PSC, solicitation number, submission portal, mandatory site walk, bonding) are not provided in the notice and must be verified from the official solicitation.
- Because scope details are absent, avoid hard pricing until drawings/specs, roof area, system type, tear-off requirements, and access constraints are confirmed.
- Plan pricing around major cost drivers to validate quickly once documents are received: roof system selection, demolition/abatement unknowns, decking repairs allowance, edge metal/details, crane/hoisting, and warranty level (none specified).
- Consider lining up a qualified roofing subcontractor or manufacturer-certified installer if the required roof system mandates certification (system unknown; confirm in documents).
- Potential subs to pre-identify once specs are known: sheet metal/edge metal, structural/deck repair, insulation, and disposal/hauling.
- Insufficient information in the notice (no specs, drawings, attachments, or solicitation number) creates a high risk of mis-scoping and pricing errors if you proceed without the full bid package.
- Potential for mandatory site visit, addenda, or specific warranty/manufacturer requirements that could be missed because no resource links/attachments are provided.
- School facility constraints (access, hours, safety) may materially affect means/methods and cost; not stated and must be confirmed.
- Where is the full solicitation package for NS26-96 (link/portal), and what is the solicitation number?
- What roof areas/buildings are included at Gateway Preparatory Academy, and what are the required roofing system type(s) and warranty duration?
- Is a pre-bid meeting or site walk mandatory, and what are the dates/times?
- What are the submission instructions (electronic vs. sealed bid), required bid forms, and required bid security/bonding?
- Are there specific work-hour restrictions or phasing requirements due to school operations?
- Are there known deck repairs, moisture remediation, or hazardous material considerations (e.g., asbestos) included or excluded?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Solicitation number and where to download the bid package (no links/attachments provided).
- Scope details: roof type/system, quantities/roof area, tear-off vs overlay, details, and performance/warranty requirements.
- Submission method and required bid/proposal forms.
- Site visit/pre-bid meeting requirements and dates.
- Bonding/insurance requirements and contract terms.
- Place of performance address and site access constraints.
- Project schedule/period of performance and any phasing constraints.
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.