Skip to content
Division of Purchasing

NS26-98 Grantsville City Wastewater Treatment Plant - DBE Subcontractors & Suppliers

Solicitation: Not available
Notice ID: ut-u3p-223323
Contract snapshot

Federal opportunity from Division of Purchasing. Place of performance: UT. Response deadline: Mar 24, 2026.

Source
Open on official portal →
Solicitation
ut-u3p-223323
Performance
Utah
Response
Mar 24, 2026, 09:00 PM UTC
Open on official portal →
Live POP
Place of performance
Utah
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Division of Purchasing
Agency
Not available
Subagency
Not available
Office
Not available
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
UT20260100 (Rev 1)
Published May 18, 2026Utah • Summit
29 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 27 more rate previews.
Davis-BaconBest fitstate match
UT20260100 (Rev 1)
Open WD
Published May 18, 2026Utah • Summit
Rate
TRUCK DRIVER: WATER TRUCK
Base $22.44Fringe $11.51
Rate
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK
Base $27.34Fringe $8.55
Rate
TRUCK DRIVER: DUMP TRUCK
Base $22.32Fringe $9.09
+26 more occupation rates in this WD
Davis-Baconstate match
UT20260111 (Rev 1)
Open WD
Published May 18, 2026Utah • Weber
Rate
TRUCK DRIVER: WATER TRUCK
Base $25.25Fringe $11.47
Rate
TRUCK DRIVER: VACTOR
Base $23.40Fringe $0.00
Rate
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK
Base $27.78Fringe $11.64
+31 more occupation rates in this WD
Davis-Baconstate match
UT20260076 (Rev 1)
Open WD
Published May 18, 2026Utah • Sanpete
Rate
BOILERMAKER
Base $44.37Fringe $26.87
Rate
ELECTRICIAN
Base $41.23Fringe $17.66
Rate
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)
Base $31.86Fringe $15.83
+14 more occupation rates in this WD
Davis-Baconstate match
UT20260020 (Rev 1)
Open WD
Published May 18, 2026Utah • Millard
Rate
OPERATOR: POWER EQUIPMENT (3) BACKHOE/EXCAVATOR
Base $30.78Fringe $16.09
Rate
OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY
Base $22.03Fringe $11.88
Rate
OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY
Base $35.68Fringe $17.57
+18 more occupation rates in this WD

Description

NS26-98 Grantsville City Wastewater Treatment Plant - DBE Subcontractors & Suppliers

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,522,398,754
Sector total $3,522,398,754 • Share 100.0%
Live
Median
$350,000
P10–P90
$31,970$3,446,688
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,522,398,754)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 28, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The opportunity pertains to subcontracting and supplier roles for the NS26-98 Grantsville City Wastewater Treatment Plant project. Interested vendors must focus on meeting DBE (Disadvantaged Business Enterprise) requirements. The response deadline is set for March 24, 2026, making this an essential bid for companies specializing in wastewater treatment projects and ensuring diversity requirements are met.

DBEsubcontractorssupplierswastewater treatmentGrantsville City
What the buyer is trying to do

The buyer aims to engage DBE subcontractors and suppliers for the construction and supply needs related to the Grantsville City Wastewater Treatment Plant project.

Who should pursue this
  • Construction firms specializing in wastewater treatment
  • Suppliers of construction materials
  • DBE-certified companies within the related sectors
Work breakdown
  • Identify potential DBE subcontractors
  • Develop a supply chain plan
  • Submit proposals that include DBE participation
  • Adhere to all DBE documentation requirements
Response package checklist
  • DBE certification documentation
  • Detailed company capabilities statement
  • Project experience in wastewater treatment
  • Key personnel resumes
  • Pricing breakdown for subcontracting roles
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure compliance with all DBE requirements outlined by the Division of Purchasing
  • Maintain documentation for all DBE contributions throughout the contract period
Pricing strategy
  • Consider competitive pricing for subcontractor roles while factoring in DBE requirements
  • Prepare cost proposals that reflect the inclusion of DBE suppliers
Teaming and subs
  • Partner with established DBE firms to enhance proposal competitiveness
  • Consider joint ventures with experienced subcontractors specializing in wastewater projects
Risks and watchouts
  • Challenges in finding suitable DBE partners
  • Potential for compliance issues regarding DBE participation
  • Time constraints in preparing an adequate response before the deadline
Smart questions to ask
  • What specific DBE participation goals are expected for this project?
  • Are there preferred DBE subcontractors already in place?
  • What documentation will be required to demonstrate DBE compliance?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Details on specific DBE goals or quotas for the project
  • Information on the scope of work required from subcontractors
  • Identification of currently approved DBE firms
  • Clarification of performance requirements for suppliers
  • Any previous contracts that may inform pricing strategies
  • Timeline for awarding contracts
  • Specific regulatory requirements or standards related to the project's DBE participation
  • Expected project budget range
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.