Skip to content
Federal Bid Partners LLCProposal & grant writing, plus GSA Schedules
Summit County

Summit County Olympic Parkway Extension Corridor Study

Solicitation: Not available
Notice ID: ut-u3p-239216
DepartmentSummit CountyAgencyCountiesStateUTPostedDueJul 01, 2026, 11:00 PM UTCCloses in 22 daysBid range$316,256 - $374,822
Contract snapshot

Federal opportunity from COUNTIES • Summit County. Place of performance: UT. Response deadline: Jul 01, 2026.

Source
Open on official portal →
Solicitation
ut-u3p-239216
Performance
Utah
Response
Jul 01, 2026, 11:00 PM UTC
Open on official portal →
Live POP
Place of performance
Utah
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Summit County
Agency
COUNTIES
Subagency
COUNTIES
Office
Not available
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match • county match
UT20260011 (Rev 1)
Published May 18, 2026Utah • Summit
33 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 31 more rate previews.
Davis-BaconBest fitstate match • county match
UT20260011 (Rev 1)
Open WD
Published May 18, 2026Utah • Summit
Rate
LINE CONSTRUCTION: LINEMAN
Base $58.83Fringe $21.21
Rate
OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, BOBCAT/SKID LOADER, FRONT END LOADER(UNDER 2 CU. YDS.), OILER
Base $36.55Fringe $18.62
Rate
OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BULLDOZER, FRONT END LOADER(2 TO 5 CU. YDS.), GRADE SETTER, OIL DISTRIBUTOR, SCRAPER
Base $37.79Fringe $18.62
+30 more occupation rates in this WD
Davis-Baconstate match • county match
UT20260035 (Rev 1)
Open WD
Published May 18, 2026Utah • Summit
Rate
OPERATOR: POWER EQUIPMENT: (7) ROLLER (DIRT AND GRADE COMPACTION)
Base $21.50Fringe $15.65
Rate
OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, FRONT END LOADER (UNDER 2 CU. YDS.)
Base $23.37Fringe $15.65
Rate
OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BACKHOE LOADER COMBO, BULLDOZER, FRONT END LOADER (2 TO 5 CU. YDS.), OIL DISTRIBUTOR
Base $24.37Fringe $15.65
+50 more occupation rates in this WD
Davis-Baconstate match • county match
UT20260100 (Rev 1)
Open WD
Published May 18, 2026Utah • Summit
Rate
TRUCK DRIVER: WATER TRUCK
Base $22.44Fringe $11.51
Rate
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK
Base $27.34Fringe $8.55
Rate
TRUCK DRIVER: DUMP TRUCK
Base $22.32Fringe $9.09
+26 more occupation rates in this WD
Davis-Baconstate match
UT20260092 (Rev 1)
Open WD
Published May 18, 2026Utah • Juab
Rate
ELECTRICIAN
Base $41.23Fringe $17.66
Rate
POWER EQUIPMENT OPERATOR (MECHANIC)
Base $33.04Fringe $16.09
Rate
TRAFFIC CONTROL (FLAGGER)
Base $23.71Fringe $9.78
+7 more occupation rates in this WD

Description

Summit County Olympic Parkway Extension Corridor Study

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,061,791,448
Sector total $2,061,791,448 • Share 100.0%
Live
Median
$205,632
P10–P90
$30,120$4,158,774
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,061,791,448)
Deal sizing
$205,632 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.