IFB 25003 Town of Clifton Streetscape Project Phase II - Duct Bank Construction (Stage 1) and Roadway Construction (Stage 2)
Federal opportunity from L773TOWNOFCLIFTON • Town of Clifton. Place of performance: VA. Response deadline: Jun 25, 2026.
- Source
- Open on official portal →
- Solicitation
- vaeva_ab40db57da06d695c02b2c071d0ab2462bd7fb6b
- Performance
- Town of Clifton , Virginia
- Response
- Jun 25, 2026, 02:30 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 18 more rate previews.↓
Description
The construction of a new duct bank for the purpose of relocating the existing utilities that are in conflict with the Town of Clifton Streetscape Project and the demolition and reconstruction of Main Street in Clifton VA between Chapel Street and Ford Lane.
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.