Davis-Bacon
AZ20260007 (Rev 2)
Coverage: Arizona • Apache, Cochise, Coconino +7.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| BOILERMAKER | $36.07 | $30.59 |
| PER HOUR | $31.68 | $8.90 |
| PER HOUR | $32.74 | $9.52 |
| PILEDRIVERMAN | $27.38 | $12.44 |
| CARPENTER (INCLUDING FORM WORK) | $28.08 | $12.74 |
| SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER | $40.61 | $17.53 |
| SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER | $48.29 | $8.93 |
| SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER | $45.17 | $8.93 |
| SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER | $43.79 | $8.93 |
| SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER | $28.49 | $8.93 |
| SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER | $25.37 | $8.93 |
| SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER | $22.98 | $8.93 |
| AND PINAL COU | $36.50 | $14.84 |
| PER HOUR | $33.00 | $13.04 |
| H NORTHEASTERLY TO WHERE IT INTERSECTS THE NAVAJO INDIAN RESERVATION THEN EASTERLY ALONG THE NAVAJO INDIAN RESERVATION BOUNDARY LINE TO A POINT WHERE IT INTERSECTS THE NAVAJO-APACHE COUNTY LINE); PINAL | $30.30 | $12.36 |
| PER HOUR OVER BASE RATE | $32.42 | $11.72 |
| IVERSAL EQUIPMENT OPERATOR (BACKHOE, CLAMSHELL, DRAGLINE, SHOVEL ETC., UP TO 10 CU. YD.); OPERATING ENGINEERS ELECTRICIAN INCLUDING TOWER ERECTOR, LINEMAN & CABLE SPLICER (LOAD SIDE OF MAIN DISCONNECT) | $31.39 | $11.72 |
| G DEVICE FOR CONCRETE FORMS), SOIL CEMENT ROAD MIXINGMACHINE (SINGLE PASS TYPE), HEATER AND PLANER, TRACTOR (DOZER, PUSHER-ALL), TRAVELING PIPE-WRAPPING MACHINE, TRENCHING MACHINE, TUGGER (TWO OR MORE) | $30.31 | $11.72 |
| PELLED COMPACTOR (WITH BLADE)-BACKFILL, DITCH OPERATION, STRAW BLOWER, TRACTOR (D-5 AND UNDER), TRIPPER, TUGGER, WELDING MACHINE, WHEEL-TYPE TRACTOR (FORD, FERGUSON TYPE WITH ATTACHMENTS, BEE GEE ETC.) | $27.04 | $11.72 |
| PAINTER | $25.47 | $8.00 |
| CEMENT MASON/CONCRETE FINISHER | $28.78 | $9.17 |
| PLUMBER/PIPEFITTER COCHISE AND SANTA CRUZ | $48.40 | $19.50 |
| PLUMBER/PIPEFITTER APACHE, COCONINO,GILA, GREENLEE, LA PAZ, NAVAJO, AND YAVAPAI | $48.40 | $19.50 |
| PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024 | $29.47 | $1.65 |
| PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024 | $27.80 | $1.65 |
| PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024 | $28.68 | $1.65 |
| PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024 | $27.43 | $1.65 |
| PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024 | $26.95 | $1.65 |