Davis-Bacon
CA20260004 (Rev 1)
Coverage: California • Del Norte, Humboldt, Lake +1.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (2) DEL NORTE, HUMBOLDT, LAKE COUNTIES | $64.56 | $25.07 |
| ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (1) MENDOCINO COUNTY | $64.56 | $25.07 |
| TERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT) | $35.31 | $12.75 |
| MARBLE FINISHER | $42.06 | $19.80 |
| MARBLE MASON | $61.72 | $30.31 |
| PER HOUR ABOVE THE REGULAR RATE | $57.02 | $28.50 |
| TERRAZZO WORKER/SETTER | $60.58 | $29.79 |
| TERRAZZO FINISHER | $44.93 | $20.98 |
| TILE LAYER LAKE & MENDOCINO COUNTIES | $56.79 | $22.54 |
| TILE LAYER DEL NORTE & HUMBOLDT COUNTIES | $59.92 | $22.62 |
| TILE FINISHER LAKE & MENDOCINO COUNTIES | $35.78 | $19.23 |
| TILE FINISHER DEL NORTE & HUMBOLDT COUNTIES | $37.75 | $19.28 |
| F CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT | $59.51 | $34.69 |
| F CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT | $64.51 | $34.69 |
| F CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT | $103.62 | $34.69 |
| F CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT | $60.51 | $34.69 |
| F CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT | $54.10 | $34.69 |
| PILEDRIVER | $54.10 | $34.69 |
| CARPENTERS: MILLWRIGHT (DEL NORTE, HUMBOLDT, LAKE AND MENDOCINO COUNTIES) | $50.12 | $33.08 |
| CARPENTERS: JOURNEYMAN CARPENTER DEL NORTE, HUMBOLDT, LAKE AND MENDOCINO COUNTIES | $47.62 | $31.49 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER DEL NORTE, HUMBOLDT, LAKE AND MENDOCINO COUNTIES | $47.77 | $31.49 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER DEL NORTE, HUMBOLDT, LAKE AND MENDOCINO COUNTIES | $54.85 | $31.49 |
| PER HOUR | $59.17 | $32.04 |
| UNDMAN HUMBOLDT, LAKE AND MENDOCINO COUNTIES HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY | $40.76 | $21.76 |
| PMENT) HUMBOLDT, LAKE AND MENDOCINO COUNTIES HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY | $53.30 | $22.26 |
| PLICER HUMBOLDT, LAKE AND MENDOCINO COUNTIES HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY | $70.16 | $24.71 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING, Truck Crane Oiler - AREA 1:: GROUP 3 | $45.12 | $31.15 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING, Truck Crane Oiler - AREA 1:: GROUP 2 | $45.41 | $31.15 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING, Truck Crane OIler - AREA 1:: GROUP 1 | $45.66 | $31.15 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING, Oiler - AREA 1:: GROUP 3 | $42.89 | $31.15 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING, Oiler - AREA 1:: GROUP 2 | $43.11 | $31.15 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING, Oiler - AREA 1:: GROUP 1 | $43.38 | $31.15 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA 1:: GROUP 3 | $49.14 | $31.15 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA 1:: GROUP 2 | $50.82 | $31.15 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA 1:: GROUP 1 | $52.64 | $31.15 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 6 | $42.50 | $31.15 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 5 | $44.73 | $31.15 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 4 | $47.37 | $31.15 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 5) | $58.09 | $32.53 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 4) | $59.23 | $32.53 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 3) | $60.37 | $32.53 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 2) | $61.70 | $32.53 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 1-A) | $65.43 | $32.53 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 1) | $62.96 | $32.53 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 5) | $58.19 | $32.53 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 4) | $59.33 | $32.53 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 3) | $60.47 | $32.53 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 2) | $61.80 | $32.53 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 1) | $63.06 | $32.53 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION, Hydraulic - AREA 1:: GROUP 3 | $60.61 | $32.53 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION, Cranes - AREA 1:: GROUP 3 | $65.56 | $32.53 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 5 | $62.24 | $32.53 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 4 | $63.54 | $32.53 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 2 | $67.04 | $32.53 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 1 | $68.81 | $32.53 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 4 | $61.30 | $32.53 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 3 | $64.34 | $32.53 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 2 | $66.08 | $32.53 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 1 | $68.59 | $32.53 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 8-A | $55.49 | $32.53 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 8 | $57.70 | $32.53 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 7 | $58.84 | $32.53 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 6 | $59.98 | $32.53 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 5 | $61.30 | $32.53 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 4 | $62.57 | $32.53 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 3 | $63.95 | $32.53 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 2 | $65.43 | $32.53 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 1 | $66.96 | $32.53 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 (AREA 2) | $49.64 | $28.56 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 (AREA 1) | $47.64 | $28.56 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 (AREA 2) | $54.25 | $28.56 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 (AREA 1) | $52.25 | $28.56 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 (AREA 2) | $57.85 | $28.56 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 (AREA 1) | $55.85 | $28.56 |
| IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL (DEL NORTE COUNTY) | $43.75 | $34.45 |
| IRONWORKERS: FENCE ERECTOR DEL NORTE COUNTY | $45.78 | $26.51 |
| IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL HUMBOLDT, LAKE AND MENDOCINO COUNTIES | $50.70 | $35.15 |
| IRONWORKERS: FENCE ERECTOR HUMBOLDT, LAKE AND MENDOCINO COUNTIES | $45.78 | $26.51 |
| LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 2 | $38.15 | $30.03 |
| LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 1 | $39.15 | $30.03 |
| PER HOUR ADDITIONAL | $37.54 | $25.55 |
| TRAFFIC CONTROL PERSON II TRAFFIC CONTROL PERSON II: INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES | $34.06 | $27.30 |
| OL/LANE CLOSURE): TRAFFIC CONTROL PERSON I TRAFFIC CONTROL PERSON I: LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES | $36.56 | $27.30 |
| LABORER (TRAFFIC CONTROL/LANE CLOSURE): ESCORT DRIVER, FLAG PERSON DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES | $36.26 | $27.30 |
| PER HOUR ADDITIONAL. LABORER CLASSIFICATIONS | $35.35 | $27.30 |
| PER HOUR ADDITIONAL. LABORER CLASSIFICATIONS | $35.50 | $27.30 |
| PER HOUR ADDITIONAL | $35.25 | $27.30 |
| PER HOUR ADDITIONAL | $36.46 | $27.30 |
| PER HOUR ADDITIONAL | $35.37 | $27.30 |
| PER HOUR ADDITIONAL. LABORER CLASSIFICATIONS | $28.94 | $27.30 |
| PER HOUR ADDITIONAL. LABORER CLASSIFICATIONS | $35.25 | $27.30 |
| PER HOUR ADDITIONAL. LABORER CLASSIFICATIONS | $36.08 | $27.30 |
| PER HOUR ADDITIONAL. LABORER CLASSIFICATIONS | $36.05 | $27.30 |
| PER HOUR ADDITIONAL. LABORER CLASSIFICATIONS | $35.55 | $27.30 |
| PER HOUR ADDITIONAL. LABORER CLASSIFICATIONS | $35.72 | $27.30 |
| ERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $36.20 | $27.30 |
| GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS (New Construction) | $35.25 | $27.30 |
| GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS (Establishment Warranty Period) | $28.94 | $27.30 |
| TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES | $46.41 | $27.72 |
| TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN (DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES) | $44.42 | $27.72 |
| RS: GROUP 4- VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD) (DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES) | $44.96 | $27.72 |
| RETIMBERMAN (WOOD OR STEEL OR SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL LABORER WORK); CABLE TENDER; CHUCK TENDER; POWDERMAN - PRIMER HOUSE (DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES) | $45.41 | $27.72 |
| TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES) | $45.66 | $27.72 |
| PER HOUR ADDITIONAL | $36.84 | $26.24 |
| PAINTERS LAKE AND MENDOCINO COUNTIES | $53.38 | $28.04 |
| PAINTERS: SANDBLASTER, SPRAY, STRUCTURAL STEEL & SWING STAGE DEL NORTE AND HUMBOLDT COUNTIES | $13.60 | $2.94 |
| PAINTERS: BRUSH & ROLLER DEL NORTE AND HUMBOLDT COUNTIES | $13.35 | $2.94 |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3 PROTECTIVE COATING, PAVEMENT SEALING | $35.11 | $17.62 |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 1 STRIPER: LAYOUT AND APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING; HOT THERMO PLASTIC; TAPE, TRAFFIC STRIPES AND MARKINGS | $40.83 | $17.62 |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2 GAMECOURT & PLAYGROUND INSTALLER | $34.71 | $17.62 |
| CEMENT MASON/CONCRETE FINISHER | $32.15 | $23.27 |
| PLUMBER: ALL OTHER WORK - NEW CONSTRUCTION RATE (LAKE AND MENDOCINO COUNTIES) | $91.00 | $49.40 |
| LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTLIITY FITTER LAKE AND MENDOCINO COUNTIES | $77.35 | $36.53 |
| UNDERGROUND UTILITY WORKER: LANDSCAPE FITTER DEL NORTE AND HUMBOLDT COUNTIES | $36.01 | $18.50 |
| OR LESS) | $55.92 | $45.29 |
| SHEET METAL WORKER (ALL OTHER WORK) | $64.06 | $46.83 |
| SPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED. TRUCK DRIVER CLASSIFICATIONS | $44.56 | $34.28 |
| SPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED. TRUCK DRIVER CLASSIFICATIONS | $44.21 | $34.28 |
| SPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED. TRUCK DRIVER CLASSIFICATIONS | $43.86 | $34.28 |
| SPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED. TRUCK DRIVER CLASSIFICATIONS | $43.56 | $34.28 |
| SPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED. TRUCK DRIVER CLASSIFICATIONS | $43.26 | $34.28 |
Related Wage Determinations
View directory →Davis-Bacon
CA20260015 (Rev 3)
California • Ventura
Davis-Bacon
CA20260026 (Rev 3)
California • San Bernardino
Davis-Bacon
CA20260009 (Rev 1)
California • Fresno, Kern, Madera +4
Davis-Bacon
CA20260002 (Rev 3)
California • Imperial
Davis-Bacon
CA20260016 (Rev 3)
California • Tulare
Davis-Bacon
CA20260017 (Rev 3)
California • Imperial, Los Angeles, Orange +5