Davis-Bacon
FL20260019 (Rev 1)
Coverage: Florida • Levy.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ELECTRICIAN | $33.50 | $13.85 |
| POWER EQUIPMENT OPERATOR: GROUP 3 CRANES NOT DESCRIBED ABOVE | $37.01 | $16.85 |
| POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES | $38.01 | $16.85 |
| FT BOOM | $39.01 | $16.85 |
| IRONWORKER: STRUCTURAL AND REINFORCING | $29.50 | $12.98 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $25.75 | $16.92 |
| TRUCK DRIVER, INCLUDES DUMP AND 10 YARD HAUL AWAY | $8.00 | $0.15 |
| ROOFER: BUILT UP, COMPOSITION, HOT TAR AND SINGLE PLY | $12.00 | $0.00 |
| PLUMBER | $12.27 | $3.33 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $10.10 | $0.00 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $9.58 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR | $13.19 | $0.00 |
| LABORER: PIPELAYER | $11.42 | $1.95 |
| LABORER: COMMON OR GENERAL | $9.95 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $16.79 | $0.00 |
| CARPENTER, INCLUDES FORM WORK | $14.79 | $1.81 |